{"id":287,"date":"2022-11-10T09:35:57","date_gmt":"2022-11-10T01:35:57","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=287"},"modified":"2024-11-22T14:47:25","modified_gmt":"2024-11-22T06:47:25","slug":"daiming-manufacturing-many-containers-have-been-exported-one-after-another-one-stop-service-has-been-improved-again","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/ro\/daiming-manufacturing-many-containers-have-been-exported-one-after-another-one-stop-service-has-been-improved-again\/","title":{"rendered":"Produc\u021bia Daming | Multe containere au fost exportate unul dup\u0103 altul, serviciul \u201cun loc\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou."},"content":{"rendered":"<p>De la livrarea reu\u0219it\u0103 a primului lot de turn din o\u021bel duplex pentru cunoscute fabrici de h\u00e2rtie de prim\u0103 clas\u0103 la sf\u00e2r\u0219itul lui septembrie, Da Ming Heavy Industry a livrat recent condensator GNA II pentru Siemens Energy, echipamente pentru pulpare, precum \u0219i proiecte prefabricate de reactor din o\u021bel duplex, care au eviden\u021biat serviciile \u201cone-stop\u201d de procesare \u0219i fabrica\u021bie ale Daming pentru recipiente.<\/p>\r\n\r\n\r\n\r\n<p><strong>Echipamentul condensator GNA II pentru Siemens Energy\u00a0<\/strong><\/p>\r\n\r\n\r\n\r\n<p>Siemens Energy este o \u00eentreprindere tehnologic\u0103 cu activit\u0103\u021bi ce acoper\u0103 \u00eentreaga lan\u021b valoric al energiei: produc\u021bia de energie, transmiterea acesteia, aplica\u021bii industriale \u00een domeniul energiei, noi surse de energie \u0219i energie regenerabil\u0103. \u00cen ianuarie 2022, Siemens a semnat un contract oficial cu Da Ming Heavy Industry pentru exportul de servicii de fabrica\u021bie de echipamente condensatoare de mare scar\u0103 c\u0103tre Brazilia.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" title=\"Fabrica\u021bia Daming | Multe containere au fost exportate una dup\u0103 alta, serviciul \u201cone-stop\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou.\" class=\"aligncenter wp-image-251 size-full\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news1.jpg\" alt=\"Fabrica\u021bia Daming | Multe containere au fost exportate una dup\u0103 alta, serviciul \u201cone-stop\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou.\" width=\"667\" height=\"364\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news1.jpg 667w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news1-300x164.jpg 300w\" sizes=\"auto, (max-width: 667px) 100vw, 667px\" \/><\/figure>\r\n\r\n\r\n\r\n<p>Cu o greutate total\u0103 de 688 de tone, acest set de echipamente este unul dintre cele mai mari condensatoare fabricate de Siemens Energy \u00een China. Componentele sale principale sunt pl\u0103ci cu tuburi p\u0103trate care con\u021bin peste 50.000 de tuburi de schimb termic din titan.<\/p>\r\n\r\n\r\n\r\n<p>Da Ming Heavy Industry a pus \u00een func\u021biune o echip\u0103 special\u0103 PM, sprijinit\u0103 puternic de echipa Siemens Energy, dep\u0103\u0219ind activ \u00een mod eficient multe dificult\u0103\u021bi \u00een timpul fabrica\u021biei. Personalul din toate departamentele a depus eforturi considerabile pentru calitatea final\u0103 a echipamentelor.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" title=\"Fabrica\u021bia Daming | Multe containere au fost exportate una dup\u0103 alta, serviciul \u201cone-stop\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou.\" class=\"aligncenter wp-image-252 size-full\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news22.jpg\" alt=\"Fabrica\u021bia Daming | Multe containere au fost exportate una dup\u0103 alta, serviciul \u201cone-stop\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou.\" width=\"638\" height=\"227\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news22.jpg 638w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news22-300x107.jpg 300w\" sizes=\"auto, (max-width: 638px) 100vw, 638px\" \/><\/figure>\r\n\r\n\r\n\r\n<p><strong>Proiecte de reactor \u0219i turn din o\u021bel duplex pentru industria producerii de h\u00e2rtie<\/strong><\/p>\r\n\r\n\r\n\r\n<p>Primele dou\u0103 loturi de produse livrate de Daming c\u0103tre o \u00eentreprindere interna\u021bional\u0103 de top \u00een industria producerii de h\u00e2rtie sunt reactori din o\u021bel duplex \u0219i proiecte prefabricate de turn. Pe baza propriilor avantaje ale Da Ming, am finalizat cu succes o serie de procese de servicii, de la materialele prime p\u00e2n\u0103 la livrare.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" title=\"Fabrica\u021bia Daming | Multe containere au fost exportate una dup\u0103 alta, serviciul \u201cone-stop\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou.\" class=\"aligncenter wp-image-253 size-full\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b1.jpg\" alt=\"Fabrica\u021bia Daming | Multe containere au fost exportate una dup\u0103 alta, serviciul \u201cone-stop\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou.\" width=\"670\" height=\"736\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b1.jpg 670w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b1-273x300.jpg 273w\" sizes=\"auto, (max-width: 670px) 100vw, 670px\" \/><\/figure>\r\n\r\n\r\n\r\n<p>Cele dou\u0103 loturi de proiecte au adoptat metoda de prefabricare segmentat\u0103. \u00cen timpul procesului de fabrica\u021bie, dimensiunile componentelor echipamentelor trebuie controlate strict pentru a asigura montarea reu\u0219it\u0103 a echipamentelor dup\u0103 sosirea lor la loca\u021bia din Brazilia.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" title=\"Fabrica\u021bia Daming | Multe containere au fost exportate una dup\u0103 alta, serviciul \u201cone-stop\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou.\" class=\"aligncenter wp-image-254 size-full\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b2.jpg\" alt=\"Fabrica\u021bia Daming | Multe containere au fost exportate una dup\u0103 alta, serviciul \u201cone-stop\u201d a fost \u00eembun\u0103t\u0103\u021bit din nou.\" width=\"664\" height=\"707\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b2.jpg 664w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b2-282x300.jpg 282w\" sizes=\"auto, (max-width: 664px) 100vw, 664px\" \/><\/figure>\r\n\r\n\r\n\r\n<p>Prin comunicare oportun\u0103 cu clien\u021bii, am valorificat pe deplin avantajele noastre, verific\u00e2nd riguros fiecare proces \u0219i realiz\u00e2nd cerin\u021bele privind calitatea, ambalarea \u0219i transportul.<\/p>\r\n\r\n\r\n\r\n<p>Exportul reu\u0219it al mai multor proiecte de recipiente nu doar a demonstrat c\u0103 Da Ming este \u00een m\u0103sur\u0103 s\u0103 exporte cu succes tot felul de recipiente c\u0103tre clien\u021bi interna\u021bionali de top, ci a marcat, de asemenea, \u00eembun\u0103t\u0103\u021birea capacit\u0103\u021bii de fabrica\u021bie \u0219i prefabricare a Da Ming, precum \u0219i for\u021ba sa de tip \u201cone-stop\u201d.<\/p>\r\n\r\n\r\n\r\n<p>\u00cen prezent, serviciile Da Ming acoper\u0103 sectoarele energetic, pulp\u0103, petrochimic \u0219i alte industrii; de la materiale, asamblare la fa\u021ba locului sau completarea fabrica\u021biei globale a echipamentelor, a c\u00e2\u0219tigat multe laude \u0219i cooper\u0103ri continue.<\/p>\r\n\r\n\r\n\r\n<p>\u00cen viitor, Da Ming va continua s\u0103 profundizeze nevoile clien\u021bilor, s\u0103 valorifice propriile avantaje, s\u0103 ofere cu tot sufletul un serviciu \u201cone-stop\u201d pentru \u00eentreaga lan\u021b industrial\u0103, iar \u00een acela\u0219i timp s\u0103 consolideze inova\u021bia tehnologic\u0103, ajut\u00e2nd clien\u021bii s\u0103-\u0219i creasc\u0103 competitivitatea global\u0103, s\u0103 colaboreze pentru un dezvoltare win-win!<\/p>","protected":false},"excerpt":{"rendered":"<p>Since the successful delivery of the first batch of duplex-steel tower for famous first-rate paper mills\u00a0at the end of Sept., Da Ming Heavy Industry has\u00a0delivered GNA II condenser\u00a0for\u00a0Siemens Energy, pulping\u00a0equipment,\u00a0duplex-steel reactor prefabrication projects recently ,\u00a0which\u00a0highlighted\u00a0Daming&#8217;s &#8220;one-stop&#8221; processing and manufacturing services for\u00a0vessels. GNA II condenser equipment for Siemens Energy\u00a0 Siemens Energy is a technology enterprise with [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":251,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-287","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daming-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/posts\/287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/comments?post=287"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/posts\/287\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/media\/251"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/media?parent=287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/categories?post=287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/ro\/wp-json\/wp\/v2\/tags?post=287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}