{"id":2321,"date":"2025-12-23T17:01:41","date_gmt":"2025-12-23T09:01:41","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=2321"},"modified":"2025-12-23T17:01:41","modified_gmt":"2025-12-23T09:01:41","slug":"jingjiang-daming-surpasses-100000-tons-in-monthly-processing-volume","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/lv\/jingjiang-daming-surpasses-100000-tons-in-monthly-processing-volume\/","title":{"rendered":"Jingjiang Daming Surpasses 100,000 Tons in Monthly Processing Volume"},"content":{"rendered":"<p style=\"text-align: justify;\" data-start=\"367\" data-end=\"756\">In November, Jingjiang Daming achieved a major production milestone as its monthly steel processing volume\u2014covering cutting, grinding, and leveling\u2014exceeded 100,000 tons for the first time. This breakthrough not only marks a new high for Jingjiang Daming\u2019s processing capacity, but also fully demonstrates the integrated operational strength and synergistic advantages of the Daming Group.<\/p>\n<p data-start=\"367\" data-end=\"756\">\n<figure id=\"attachment_2322\" aria-describedby=\"caption-attachment-2322\" style=\"width: 598px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-2322\" title=\"Damings Workshops Are Operating in Order\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Damings-Workshops-Are-Operating-in-Order.jpg\" alt=\"Damings Workshops Are Operating in Order\" width=\"598\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Damings-Workshops-Are-Operating-in-Order.jpg 598w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Damings-Workshops-Are-Operating-in-Order-300x226.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Damings-Workshops-Are-Operating-in-Order-16x12.jpg 16w\" sizes=\"(max-width: 598px) 100vw, 598px\" \/><figcaption id=\"caption-attachment-2322\" class=\"wp-caption-text\">Damings Workshops Are Operating in Order<\/figcaption><\/figure>\n<p data-start=\"367\" data-end=\"756\">\n<p style=\"text-align: justify;\" data-start=\"758\" data-end=\"1209\">During the month, Jingjiang Daming, one of Daming&#8217;s 11 processing centers, stainless steel processing volume increased by 4% year-on-year and 14% month-on-month, while carbon steel processing volume grew by more than 18% year-on-year and over 34% month-on-month. The strong and balanced growth across product categories reflects Jingjiang Daming\u2019s position within the Daming Group\u2019s nationwide processing and service network, enabling the company to respond quickly and effectively to rising customer demand.<\/p>\n<p data-start=\"758\" data-end=\"1209\">\n<figure id=\"attachment_2324\" aria-describedby=\"caption-attachment-2324\" style=\"width: 527px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"size-full wp-image-2324\" title=\"Damings Processing Lines Are Working in Order\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Damings-Processing-Lines-Are-Working-in-Order.jpg\" alt=\"Damings Processing Lines Are Working in Order\" width=\"527\" height=\"500\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Damings-Processing-Lines-Are-Working-in-Order.jpg 527w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Damings-Processing-Lines-Are-Working-in-Order-300x285.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Damings-Processing-Lines-Are-Working-in-Order-13x12.jpg 13w\" sizes=\"(max-width: 527px) 100vw, 527px\" \/><figcaption id=\"caption-attachment-2324\" class=\"wp-caption-text\">Damings Steel Processing Lines Are Working in Order<\/figcaption><\/figure>\n<p data-start=\"758\" data-end=\"1209\">\n<p style=\"text-align: justify;\" data-start=\"1211\" data-end=\"1966\">This achievement is the result of deep coordination across the Daming Group\u2019s unified management and operating systems. Faced with rapidly increasing orders and tight delivery timelines, Jingjiang Daming fully leveraged group-level support in production organization, technical standards, equipment management, and resource allocation. Production teams ensured stable and efficient line operation through continuous process optimization, while technical teams followed unified Daming processing standards to provide on-site guidance and problem-solving. At the same time, material supply, equipment maintenance, and workforce deployment were coordinated under the Group\u2019s integrated platform, ensuring smooth and efficient production throughout the month.<\/p>\n<p style=\"text-align: justify;\" data-start=\"1968\" data-end=\"2381\">From raw material intake to finished processing delivery, every step of the operation reflected the Daming Group\u2019s \u201cone platform, one standard, one team\u201d management philosophy. The breakthrough of the 100,000-ton monthly processing mark is a concrete result of cross-base collaboration, shared resources, and the Group\u2019s long-standing focus on execution efficiency, quality control, and customer-oriented service.<\/p>\n<p data-start=\"1968\" data-end=\"2381\">\n<figure id=\"attachment_2323\" aria-describedby=\"caption-attachment-2323\" style=\"width: 598px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"size-full wp-image-2323\" title=\"Plates Processed by Daming Are Ready for Shipment\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Plates-Processed-by-Daming-Are-Ready-for-Shipment.jpg\" alt=\"Plates Processed by Daming Are Ready for Shipment\" width=\"598\" height=\"432\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Plates-Processed-by-Daming-Are-Ready-for-Shipment.jpg 598w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Plates-Processed-by-Daming-Are-Ready-for-Shipment-300x217.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Plates-Processed-by-Daming-Are-Ready-for-Shipment-18x12.jpg 18w\" sizes=\"(max-width: 598px) 100vw, 598px\" \/><figcaption id=\"caption-attachment-2323\" class=\"wp-caption-text\">Steel Plates Processed by Daming Are Ready for Shipment<\/figcaption><\/figure>\n<p data-start=\"1968\" data-end=\"2381\">\n<p style=\"text-align: justify;\" data-start=\"2383\" data-end=\"2912\">Taking this milestone as a new starting point, Jingjiang Daming will continue to rely on the Daming Group\u2019s overall strengths, deepen collaboration across group bases, and further enhance its comprehensive steel processing service capabilities. By continuously improving efficiency, quality, and delivery reliability, Jingjiang Daming remains committed to supporting customers with stable, high-quality processing solutions and contributing to the Daming Group\u2019s steady, high-quality development in the steel processing industry.<\/p>","protected":false},"excerpt":{"rendered":"<p>In November, Jingjiang Daming achieved a major production milestone as its monthly steel processing volume\u2014covering cutting, grinding, and leveling\u2014exceeded 100,000 tons for the first time. This breakthrough not only marks a new high for Jingjiang Daming\u2019s processing capacity, but also fully demonstrates the integrated operational strength and synergistic advantages of the Daming Group. During the [&hellip;]<\/p>","protected":false},"author":4,"featured_media":2325,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[732],"tags":[811,457,812],"class_list":["post-2321","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-damings-eleven-processing-centers","tag-carbon-steel-processing","tag-daming-international","tag-fabricated-steel-plates"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts\/2321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/comments?post=2321"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts\/2321\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/media\/2325"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/media?parent=2321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/categories?post=2321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/tags?post=2321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}