{"id":1759,"date":"2025-07-08T17:47:55","date_gmt":"2025-07-08T09:47:55","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=1759"},"modified":"2025-07-08T17:55:44","modified_gmt":"2025-07-08T09:55:44","slug":"latest-case-study-hong-kong-s960-footbridge-project","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/lv\/latest-case-study-hong-kong-s960-footbridge-project\/","title":{"rendered":"Jaun\u0101kais gad\u012bjuma p\u0113t\u012bjums: Honkonga S960 g\u0101j\u0113ju tilta projekts"},"content":{"rendered":"<p style=\"text-align: justify;\">Pasaules pirm\u0101 S960 \u012bpa\u0161i iztur\u012bg\u0101 t\u0113rauda g\u0101j\u0113ju tilta \u010detrk\u0101r\u0161\u0101s sp\u0101res pacel\u0161anas ceremonija veiksm\u012bgi tika aizvad\u012bta Honkong\u0101 4. j\u016blij\u0101, kl\u0101tesot vald\u012bbas p\u0101rst\u0101vjiem, t\u0113rauda r\u016bpn\u012bc\u0101m, universit\u0101t\u0113m, Daming un medijiem, kas kop\u012bgi v\u0113roja \u0161o noz\u012bm\u012bgo notikumu.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Tilta projektu vada Honkongas Civil\u0101s in\u017eenierijas un att\u012bst\u012bbas departaments, un tas atrodas Fanling Zieme\u013cu jaun\u0101s att\u012bst\u012bbas teritorijas s\u0101kotn\u0113j\u0101 posm\u0101 \u2014 konkr\u0113ti, Fanling apbraucam\u0101 ce\u013ca austrumu posm\u0101.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_1761\" aria-describedby=\"caption-attachment-1761\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1761\" title=\"G\u0101j\u0113ju tilta sp\u0101re tiek pacelta\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-1024x576.png\" alt=\"G\u0101j\u0113ju tilta sp\u0101re tiek pacelta\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-1024x576.png 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-300x169.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-768x432.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-18x10.png 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted.png 1080w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1761\" class=\"wp-caption-text\">G\u0101j\u0113ju tilta sp\u0101re tiek pacelta<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">\u0160is ir pirmais gad\u012bjums pasaul\u0113, kad civilo tiltu b\u016bvniec\u012bb\u0101 izmantots S960 \u012bpa\u0161i iztur\u012bgais t\u0113rauds.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">\u0160\u012b projekta veiksm\u012bg\u0101 realiz\u0101cija kalpo k\u0101 paraugs n\u0101kotnes tiltu b\u016bvniec\u012bbas iniciat\u012bv\u0101m celtniec\u012bbas sektor\u0101.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Izmantojot S960 \u012bpa\u0161i iztur\u012bgo t\u0113raudu, var iev\u0113rojami samazin\u0101t tilta konstrukcijas svaru un pamatu p\u0101\u013cu skaitu, kas \u013cauj ietaup\u012bt zemi, samazin\u0101t oglek\u013ca emisijas un uzlabot projekta ilgtsp\u0113ju.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Turkl\u0101t S960 \u012bpa\u0161i iztur\u012bg\u0101 t\u0113rauda deta\u013cas var sagatavot r\u016bpn\u012bc\u0101, kas b\u016btiski samazina viet\u0101 veicamo procesu skaitu. \u0160\u012b mont\u0101\u017ea uz vietas samazina oglek\u013ca emisijas par 35% un sa\u012bsin\u0101s b\u016bvniec\u012bbas termi\u0146u par 40% sal\u012bdzin\u0101jum\u0101 ar tradicion\u0101lajiem procesiem, t\u0101d\u0113j\u0101di pan\u0101kot progresu projekta \u0101trum\u0101, kvalit\u0101t\u0113, efektivit\u0101t\u0113 un daudzum\u0101.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Projekts ir \u013coti noz\u012bm\u012bgs un sare\u017e\u0123\u012bts, un t\u0101 izpild\u0113 tam sniedza pla\u0161u atbalstu gan valsts iest\u0101des, gan nozares l\u012bderi, gan akad\u0113misk\u0101s aprindas. Tehniskie eksperiment\u0101lie rezult\u0101ti, ko sniedza t\u0113rauda konstrukciju speci\u0101listi no Honkongas Politehnisk\u0101s universit\u0101tes un Cinghua universit\u0101tes, bija iz\u0161\u0137iro\u0161i; AECOM, pasaules vado\u0161\u0101 firma, p\u0101rrauga projekt\u0113\u0161anu un b\u016bvniec\u012bbas uzraudz\u012bbu, savuk\u0101rt SGS metin\u0101\u0161anas un kr\u0101so\u0161anas in\u017eenieri sniedz ieguld\u012bjumu visp\u0101r\u0113j\u0101 darb\u0101, ko koordin\u0113 Daming Heavy Industry l\u012bguma ra\u017eo\u0161anai.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_1762\" aria-describedby=\"caption-attachment-1762\" style=\"width: 883px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1762\" title=\"Daming izgatavo kop\u0113jo S960 \u012bpa\u0161i iztur\u012bg\u0101 t\u0113rauda konstrukciju\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure.png\" alt=\"Daming izgatavo kop\u0113jo S960 \u012bpa\u0161i iztur\u012bg\u0101 t\u0113rauda konstrukciju\" width=\"883\" height=\"553\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure.png 883w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure-300x188.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure-768x481.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure-18x12.png 18w\" sizes=\"auto, (max-width: 883px) 100vw, 883px\" \/><figcaption id=\"caption-attachment-1762\" class=\"wp-caption-text\">Daming izgatavo kop\u0113jo S960 \u012bpa\u0161i iztur\u012bg\u0101 t\u0113rauda konstrukciju<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">\u0160is ir pirmais gad\u012bjums, kad Daming Heavy Industry iesaist\u012bj\u0101s g\u0101j\u0113ju tilta projekt\u0101. Izpildes laik\u0101 t\u0101 ne tikai nodro\u0161in\u0101ja augstas kvalit\u0101tes materi\u0101lu pieg\u0101di, bet ar\u012b pied\u0101v\u0101ja prec\u012bzus pakalpojumus grie\u0161an\u0101, form\u0113\u0161an\u0101, metin\u0101\u0161an\u0101 un virsmas apstr\u0101d\u0113. Vis\u0101 \u0161aj\u0101 period\u0101 t\u0101 atrisin\u0101ja tehniskas probl\u0113mas, piem\u0113ram, \u012bpa\u0161i iztur\u012bg\u0101 t\u0113rauda tendenci deform\u0113ties un metin\u0101\u0161anas procesa sare\u017e\u0123\u012bt\u012bbu, t\u0101d\u0113j\u0101di uzturot projekta gaitu un kvalit\u0101ti.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\"><strong><b>Tehnisk\u0101 v\u0113rt\u012bba<\/b><\/strong><\/h3>\n<p style=\"text-align: justify;\">Caur prec\u012bzu sadarb\u012bbu ar dizaineriem un uzraugiem no presti\u017eiem pasaules uz\u0146\u0113mumiem Daming uzlaboja savus tehniskos standartus; sadarbojoties ar t\u0113rauda r\u016bpn\u012bc\u0101m, t\u0101 uzkr\u0101ja iev\u0113rojamu pieredzi \u012bpa\u0161i iztur\u012bga t\u0113rauda metin\u0101\u0161an\u0101.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\">Vad\u012bbas v\u0113rt\u012bba<\/h3>\n<p style=\"text-align: justify;\">Ievie\u0161ot stingrus standartus un veicinot vad\u012bbas inov\u0101cijas projektu izpild\u0113, k\u0101 ar\u012b veicinot sadarb\u012bbu starp komand\u0101m no nozares, akad\u0113mijas, p\u0113tniec\u012bbas un pielietojuma, ir ieg\u016bta v\u0113rt\u012bga starpre\u0123ionu projektu vad\u012bbas pieredze.<\/p>\n<h3 style=\"text-align: justify;\">Z\u012bmola v\u0113rt\u012bba<\/h3>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Daming \u201cviens stop\u201d pakalpojuma efektivit\u0101te ir v\u0113lreiz apstiprin\u0101jusies, kas papla\u0161in\u0101jis pied\u0101v\u0101to pakalpojumu kl\u0101stu un palielin\u0101jis Daming z\u012bmola sp\u0113ku.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\">Nozares v\u0113rt\u012bba<\/h3>\n<p style=\"text-align: justify;\">Tas ir veicin\u0101jis augst\u0101k\u0101 l\u012bme\u0146a materi\u0101lu iek\u0161zemes ra\u017eo\u0161anu un nozares att\u012bst\u012bbu, kas ir noz\u012bm\u012bg\u0101kais faktors nozares att\u012bst\u012bb\u0101. Nozares v\u0113rt\u012bba: Augst\u0101k\u0101 l\u012bme\u0146a materi\u0101lu lokaliz\u0101cijas un pielietojuma veicin\u0101\u0161ana.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\">Soci\u0101l\u0101 v\u0113rt\u012bba<\/h3>\n<p style=\"text-align: justify;\">\u0160is ir sp\u0113c\u012bgs Daming un HKSAR vald\u012bbas sadarb\u012bbas rezult\u0101ts, kas \u013cauj vald\u012bbai nov\u0113rot kontinenta izcil\u0101s ra\u017eo\u0161anas pakalpojumu iesp\u0113jas, vienlaikus stiprinot abu re\u0123ionu vienot\u012bbu un sadarb\u012bbu.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Honkongas \u012bpa\u0161i iztur\u012bg\u0101 t\u0113rauda g\u0101j\u0113ju tilta projekta izpilde ir noz\u012bm\u012bgs pagrieziena punkts, kas atz\u012bm\u0113 \u0136\u012bnas dibin\u0101\u0161anas 76. gadadienu un Honkongas \u012bpa\u0161\u0101s administrat\u012bv\u0101s re\u0123iona 28. gadadienu.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Balstoties uz \u0161o veiksm\u012bgo sadarb\u012bbu, Daming cent\u012bsies padzi\u013cin\u0101t sadarb\u012bbu starp nozari, akad\u0113miju un p\u0113tniec\u012bbu, k\u0101 ar\u012b past\u0101v\u012bgi uzlabos savas tehnolo\u0123isko inov\u0101ciju sp\u0113jas, efekt\u012bv\u0101k veicinot liel\u0101kus infrastrukt\u016bras projektus.<\/p>","protected":false},"excerpt":{"rendered":"<p>The world&#8217;s first S960 Ultra High Strength Steel Footbridge Quadruple Span Lifting\u00a0Ceremony was successfully conducted in Hong Kong on July 4, with representatives from the government, steel mills, universities, Daming, and the media present to collectively witness this significant event. &nbsp; The bridge project is led by the Hong Kong Civil Engineering and Development Department [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1765,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[468],"tags":[457,658,659],"class_list":["post-1759","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-damings-products","tag-daming-international","tag-hong-kong-s960-footbridge-project","tag-s960-ultra-high-strength-steel-footbridge"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts\/1759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/comments?post=1759"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts\/1759\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/media\/1765"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/media?parent=1759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/categories?post=1759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/tags?post=1759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}