{"id":1663,"date":"2025-05-13T17:40:59","date_gmt":"2025-05-13T09:40:59","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=1663"},"modified":"2025-05-13T17:40:59","modified_gmt":"2025-05-13T09:40:59","slug":"another-lng-project-daming-participated-finishes-dome-lifting-in-yanan","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/lv\/another-lng-project-daming-participated-finishes-dome-lifting-in-yanan\/","title":{"rendered":"V\u0113l viens SDG projekts, kur\u0101 piedal\u012bj\u0101s Daming, pabeidz kupola pacel\u0161anu Yan'an pils\u0113t\u0101"},"content":{"rendered":"<p style=\"text-align: justify;\">\u0160a\u0146sji Yan\u010dang Petroleum Yanan LNG projekts, kuru kopum\u0101 izpild\u012bja Pekinas Petro\u0137\u012bmijas in\u017eenierija, ir sasniedzis b\u016btisku progresu.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1665\" aria-describedby=\"caption-attachment-1665\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1665\" title=\"LNG tvertnes kupola pacel\u0161ana tiek pabeigta Yanan\u0101\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1024x576.jpg\" alt=\"LNG tvertnes kupola pacel\u0161ana nosl\u0113dzas Yan\u2019an\u0101\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1024x576.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-300x169.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-768x432.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1536x864.jpg 1536w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-2048x1152.jpg 2048w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-18x10.jpg 18w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1665\" class=\"wp-caption-text\">LNG tvertnes kupola pacel\u0161ana tiek pabeigta Yanan\u0101<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Divas 50 000 m\u00b3 LNG uzglab\u0101\u0161anas tvertnes veiksm\u012bgi pabeigu\u0161as galveno procesu \u2013 dubult\u0101s tvertnes sinhron\u0101s kupola pacel\u0161anas proced\u016bru, kas iez\u012bm\u0113 projekta galven\u0101s konstrukcijas b\u016bvniec\u012bbas pabeig\u0161anu un ofici\u0101lu iest\u0101\u0161anos iek\u0161\u0113j\u0101s tvertnes mont\u0101\u017eas posm\u0101, liekot stabilu pamatu turpm\u0101kajai projekta nodo\u0161anai ekspluat\u0101cij\u0101 un darb\u012bbai.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Jingjiang Daming ir izmantojis savas stipr\u0101s puses un nodro\u0161in\u0101jis 7000 tonnu 9% ni\u0137e\u013ca t\u0113rauda gatavo konstrukciju LNG uzglab\u0101\u0161anas tvertnei, tostarp iek\u0161\u0113jo un \u0101r\u0113jo apvalku sienas pane\u013cus un apak\u0161\u0113j\u0101s pl\u0101ksnes, v\u0113lreiz apliecinot Daming sniegto pakalpojumu sp\u0113ku \u0161aj\u0101 jom\u0101.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Daming un partneri, Pekinas Petro\u0137\u012bmijas in\u017eenierija un CITIC Pacific Special Steel, ar\u012b tika aicin\u0101ti piedal\u012bties ceremonij\u0101, lai kl\u0101tien\u0113 pieredz\u0113tu \u0161\u012b sadarb\u012bbas pan\u0101kumu lielo mirkli.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1664\" aria-describedby=\"caption-attachment-1664\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1664\" title=\"Daming nodro\u0161in\u0101ja 7000 tonnu 9 ni\u0137e\u013ca t\u0113rauda\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-1024x576.png\" alt=\"Daming nodro\u0161in\u0101ja 7000 tonnu 9 ni\u0137e\u013ca t\u0113rauda\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-1024x576.png 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-300x169.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-768x432.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-18x10.png 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel.png 1080w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1664\" class=\"wp-caption-text\">Daming nodro\u0161in\u0101ja 7000 tonnu 9 ni\u0137e\u013ca t\u0113rauda<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">K\u0101 visgr\u016bt\u0101kais LNG tvertnes b\u016bvniec\u012bbas process, pneimatisk\u0101 pacel\u0161anas proced\u016bra ir \u013coti sare\u017e\u0123\u012bta un riskanta. Nr.1 un Nr.2 tvertn\u0113m kupola pacel\u0161anas realiz\u0101cijai izmantota moderna bimet\u0101la piln\u0101 kapacit\u0101tes strukt\u016bra, kur \u0101r\u0113j\u0101s tvertnes iek\u0161\u0113jais diametrs sasniedz 52 metrus, bet velvju atspole \u2013 51,8 metrus. Prec\u012bz\u0101 oper\u0101cij\u0101, kas ilga 2 stundas un 18 min\u016btes, katras tvertnes kupols, kas sver 457,37 tonnas, tika veiksm\u012bgi un vienm\u0113r\u012bgi pacelts par 29,57 metriem, beidzot realiz\u0113jot prec\u012bzu savienojumu ar spiediena gredzenu, kas nodro\u0161ina stabila pamata turpm\u0101kajai Nr.3 un Nr.4 tvertnes kupola pacel\u0161anai.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1666\" aria-describedby=\"caption-attachment-1666\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1666\" title=\"Daming piedal\u012bj\u0101s Yanan LNG projekta kupola pacel\u0161anas ceremonij\u0101\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1024x768.jpg\" alt=\"Daming piedal\u012bj\u0101s Yanan LNG projekta kupola pacel\u0161anas ceremonij\u0101\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1024x768.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-300x225.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-768x576.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1536x1152.jpg 1536w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-2048x1536.jpg 2048w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-16x12.jpg 16w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1666\" class=\"wp-caption-text\">Daming piedal\u012bj\u0101s Yanan LNG projekta kupola pacel\u0161anas ceremonij\u0101<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">K\u0101 galvenais dz\u012bvesveida projekts Yanan\u0101, projekts paredz\u0113ts, lai gad\u0101 ra\u017eotu 400 000 tonnu LNG. P\u0113c projekta pabeig\u0161anas tas efekt\u012bvi atrisin\u0101s Yanan\u0101 un apk\u0101rt\u0113jo re\u0123ionu iedz\u012bvot\u0101ju g\u0101zes piepras\u012bjumu, turpin\u0101s samazin\u0101t oglek\u013ca emisijas un ir \u013coti noz\u012bm\u012bgs re\u0123iona ener\u0123\u0113tisk\u0101s strukt\u016bras optimiz\u0113\u0161an\u0101, cilv\u0113ku dz\u012bvesvietu g\u0101zes pat\u0113ri\u0146a dro\u0161\u012bbas nodro\u0161in\u0101\u0161an\u0101 un vec\u0101 revolucion\u0101r\u0101 re\u0123iona za\u013c\u0101s att\u012bst\u012bbas veicin\u0101\u0161an\u0101.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">L\u012bdz \u0161im Daming ir apkalpojis vair\u0101k nek\u0101 70 LNG tvertnes un vair\u0101k nek\u0101 100 000 tonnu materi\u0101lu gatavo\u0161anu un apstr\u0101di, aptverot vair\u0101k nek\u0101 40% LNG sa\u0146em\u0161anas termin\u0101\u013cus no Guand\u017eou l\u012bdz Caofeidianam Tianjin\u0101, kas ir guvis vienpr\u0101t\u012bgu atzin\u012bbu no LNG projektu objektu puses, un n\u0101kotn\u0113 pak\u0101peniski att\u012bst\u012bs LNG projektus \u0101rzem\u0113s un sauszemes LNG sa\u0146em\u0161anas termin\u0101\u013cu projektus.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Shaanxi Yanchang Petroleum\u2019s Yan&#8217;an LNG Project, which was generally contracted by Beijing Petrochemical Engineering, has made significant progress. Two 50,000 m\u00b3 LNG storage tanks have successfully completed the key process of double tank synchronous dome lifting, marking the completion of the main structure construction of the project and the formal entry into the internal [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1665,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[468],"tags":[580,457,578,579,476],"class_list":["post-1663","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-damings-products","tag-beijing-petrochemical-engineering","tag-daming-international","tag-jingjiang-daming","tag-lng-receiving-terminal","tag-lng-tank"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts\/1663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/comments?post=1663"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/posts\/1663\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/media\/1665"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/media?parent=1663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/categories?post=1663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/lv\/wp-json\/wp\/v2\/tags?post=1663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}