{"id":3122,"date":"2026-11-11T15:38:54","date_gmt":"2026-11-11T07:38:54","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=3122"},"modified":"2026-11-11T15:38:54","modified_gmt":"2026-11-11T07:38:54","slug":"jingjiang-daming-advances-processing-of-two-chemical-tanker-projects","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/ja\/jingjiang-daming-advances-processing-of-two-chemical-tanker-projects\/","title":{"rendered":"Jingjiang Daming Advances Processing of Two Chemical Tanker Projects"},"content":{"rendered":"<p style=\"text-align: justify;\">Jingjiang Daming is simultaneously undertaking two shipbuilding projects involving high-end chemical tankers of 50,000 DWT and 25,900 DWT. With both projects progressing in parallel, the company is coordinating production resources and processing operations to meet demanding delivery schedules while maintaining its regular order commitments.<\/p>\n<p style=\"text-align: justify;\">The close delivery timelines require careful production planning and timely material supply. Ship plate processing also involves considerable complexity, as each vessel is assembled from multiple sections, each comprising numerous components in different specifications and categories. Efficient sorting, storage and distribution of these components are essential to ensure smooth material supply for subsequent assembly and welding operations. This makes production space allocation, material handling and workflow coordination particularly important.<\/p>\n<p style=\"text-align: justify;\">To address these requirements, Jingjiang Daming&#8217;s cutting workshop quickly reorganized its production schedule and assigned the ship plate cutting work to a dedicated 60,000-watt laser cutting machine. The equipment combines high cutting speeds and precision with narrow kerfs, making it well suited to large-format plate processing. Its wide worktable can accommodate up to six plates measuring 2.5 meters by 12 meters each, supporting continuous cutting and plate unloading operations and significantly improving processing efficiency.<\/p>\n<p style=\"text-align: justify;\">Through coordinated scheduling, the workshop has kept both tanker projects moving forward without disrupting the delivery of other regular orders. In one particularly efficient production cycle, the team completed the plate cutting for two vessel sections in just six days, providing a solid foundation for the subsequent manufacturing stages.<\/p>\n<figure id=\"attachment_3123\" aria-describedby=\"caption-attachment-3123\" style=\"width: 930px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3123\" title=\"Processed ship components neatly arranged for subsequent assembly\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/11\/Processed-ship-components-neatly-arranged-for-subsequent-assembly.png\" alt=\"Processed ship components neatly arranged for subsequent assembly\" width=\"930\" height=\"629\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/11\/Processed-ship-components-neatly-arranged-for-subsequent-assembly.png 930w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/11\/Processed-ship-components-neatly-arranged-for-subsequent-assembly-300x203.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/11\/Processed-ship-components-neatly-arranged-for-subsequent-assembly-768x519.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/11\/Processed-ship-components-neatly-arranged-for-subsequent-assembly-18x12.png 18w\" sizes=\"auto, (max-width: 930px) 100vw, 930px\" \/><figcaption id=\"caption-attachment-3123\" class=\"wp-caption-text\">Processed ship components neatly arranged for subsequent assembly<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">Both projects are now progressing in an orderly manner, and an additional vessel processing order is expected to follow. Jingjiang Daming will continue to focus on production coordination, processing accuracy and material flow to support timely project delivery and further develop its capabilities in the chemical tanker supply chain.<\/p>\n<p style=\"text-align: justify;\">","protected":false},"excerpt":{"rendered":"<p>Jingjiang Daming is simultaneously undertaking two shipbuilding projects involving high-end chemical tankers of 50,000 DWT and 25,900 DWT. With both projects progressing in parallel, the company is coordinating production resources and processing operations to meet demanding delivery schedules while maintaining its regular order commitments. The close delivery timelines require careful production planning and timely material supply. Ship plate processing also involves considerable complexity, as each vessel is assembled from multiple sections, each comprising numerous components in different specifications and categories. Efficient sorting, storage and distribution of these components are essential to ensure smooth material supply for subsequent assembly and welding operations. This makes production space allocation, material handling and workflow [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3124,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daming-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/posts\/3122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/comments?post=3122"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/posts\/3122\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/media\/3124"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/media?parent=3122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/categories?post=3122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/ja\/wp-json\/wp\/v2\/tags?post=3122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}