{"id":2187,"date":"2025-11-14T17:41:57","date_gmt":"2025-11-14T09:41:57","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=2187"},"modified":"2025-11-14T17:41:57","modified_gmt":"2025-11-14T09:41:57","slug":"visiting-europe-daming-deepens-strategic-partnership-with-ge-vernova-on-power-generation","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/hu\/visiting-europe-daming-deepens-strategic-partnership-with-ge-vernova-on-power-generation\/","title":{"rendered":"Eur\u00f3p\u00e1ban j\u00e1rva: a Daming tov\u00e1bb m\u00e9ly\u00edti a GE Vernova-val val\u00f3 strat\u00e9giai partners\u00e9get az energiatermel\u00e9s ter\u00fclet\u00e9n"},"content":{"rendered":"<p style=\"text-align: justify;\">A Daming International fels\u0151vezet\u0151i deleg\u00e1ci\u00f3ja, Zhou Keming eln\u00f6k vezet\u00e9s\u00e9vel l\u00e1togat\u00e1st tett a GE Vernova badeni irod\u00e1j\u00e1ban, hogy tov\u00e1bb er\u0151s\u00edts\u00e9k az egy\u00fcttm\u0171k\u00f6d\u00e9st a glob\u00e1lis energiaeszk\u00f6z-ell\u00e1t\u00f3 l\u00e1ncban. A deleg\u00e1ci\u00f3 tagjai k\u00f6z\u00f6tt volt Johnny Fornstedt, a Daming Europe \u00fcgyvezet\u0151 igazgat\u00f3ja; Chen Ning, a Daming Heavy Industry eln\u00f6ke; Wang Xi, a Daming Energy Equipment \u00fcgyvezet\u0151 igazgat\u00f3ja; \u00e9s Wang Xuming, a Daming International Import \u00e9s Export \u00fcgyvezet\u0151 igazgat\u00f3helyettese. Sz\u00edv\u00e9lyesen fogadt\u00e1k \u0151ket Marcelo, a GE Vernova ipari g\u0151zturbin\u00e1k glob\u00e1lis ell\u00e1t\u00e1si l\u00e1nc\u00e1nak igazgat\u00f3ja, valamint a c\u00e9g beszerz\u00e9si \u00e9s m\u00e9rn\u00f6ki csapat\u00e1nak vezet\u0151i.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\"><strong>Az egy\u00fcttm\u0171k\u00f6d\u00e9s b\u0151v\u00edt\u00e9se a n\u00f6vekv\u0151 energiaig\u00e9ny k\u00f6zepette<\/strong><\/h3>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">A tal\u00e1lkoz\u00f3n a GE Vernova badeni csapata bemutatta a c\u00e9g fejleszt\u00e9si \u00fatvonal\u00e1t, kiemelve a kulcsfontoss\u00e1g\u00fa kezdem\u00e9nyez\u00e9seket, amelyek c\u00e9lja a glob\u00e1lis dekarboniz\u00e1ci\u00f3 t\u00e1mogat\u00e1sa \u00e9s a tiszt\u00e1bb energiarendszerek fel\u00e9 tart\u00f3 gyorsul\u00f3 \u00e1tmenet. Mint a teljes\u00edtm\u00e9nytermel\u00e9si \u00e9s energiav\u00e1lt\u00e1si technol\u00f3gi\u00e1k vezet\u0151 szolg\u00e1ltat\u00f3ja, a GE Vernova hangs\u00falyozta tov\u00e1bbi innov\u00e1ci\u00f3j\u00e1t g\u00e1zturbin\u00e1k, ipari g\u0151zturbin\u00e1k, h\u00e1l\u00f3zati rendszerek \u00e9s elektromos\u00edt\u00e1si megold\u00e1sok ter\u00e9n. A c\u00e9g r\u00e1mutatott, hogy a glob\u00e1lis energia-piac \u2013 amelyet az emelked\u0151 villamosenergia-kereslet, a meg\u00fajul\u00f3 energia integr\u00e1ci\u00f3ja \u00e9s az ipari infrastrukt\u00fara moderniz\u00e1l\u00e1sa hajt \u2013 jelent\u0151s lehet\u0151s\u00e9geket k\u00edn\u00e1l strat\u00e9giai partners\u00e9gek sz\u00e1m\u00e1ra az eszk\u00f6z-ell\u00e1t\u00f3 l\u00e1ncban.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_2189\" aria-describedby=\"caption-attachment-2189\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-2189\" title=\"A Daming International l\u00e1togat\u00e1sa a GE Vernov\u00e1n\u00e1l 1\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/11\/Daming-International-Visits-GE-Vernova-1-1024x698.jpg\" alt=\"A Daming International l\u00e1togat\u00e1sa a GE Vernov\u00e1n\u00e1l 1\" width=\"800\" height=\"545\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/11\/Daming-International-Visits-GE-Vernova-1-1024x698.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/11\/Daming-International-Visits-GE-Vernova-1-300x205.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/11\/Daming-International-Visits-GE-Vernova-1-768x524.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/11\/Daming-International-Visits-GE-Vernova-1-18x12.jpg 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/11\/Daming-International-Visits-GE-Vernova-1.jpg 1280w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-2189\" class=\"wp-caption-text\">A Daming International l\u00e1togat\u00e1sa a GE Vernov\u00e1n\u00e1l 1<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Ezzel az ipari h\u00e1tt\u00e9rrel mindk\u00e9t csapat m\u00e9lyrehat\u00f3 besz\u00e9lget\u00e9seket folytatott a k\u00f6z\u00f6s projekt \u00e1ll\u00e1s\u00e1r\u00f3l, a min\u0151s\u00e9gellen\u0151rz\u00e9si elv\u00e1r\u00e1sokr\u00f3l, a k\u00f6lts\u00e9goptimaliz\u00e1l\u00e1sr\u00f3l, a term\u00e9k-sz\u00e1ll\u00edt\u00e1si menetrendr\u0151l \u00e9s a j\u00f6v\u0151beli kapacit\u00e1s-tervez\u00e9sr\u0151l. A besz\u00e9lget\u00e9s f\u00f3kusz\u00e1ban a sz\u00e1ll\u00edt\u00e1si megb\u00edzhat\u00f3s\u00e1g jav\u00edt\u00e1s\u00e1nak gyakorlati m\u00f3djai \u00e9s a hossz\u00fa t\u00e1v\u00fa egy\u00fcttm\u0171k\u00f6d\u00e9si keretek er\u0151s\u00edt\u00e9se \u00e1llt.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\"><strong>Daming International: N\u00f6vekv\u0151 er\u0151 a glob\u00e1lis energiaeszk\u00f6z-gy\u00e1rt\u00e1sban<\/strong><\/h3>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Zhou Keming eln\u00f6k elismer\u00e9st fejezett ki a GE Vernova hossz\u00fa t\u00e1v\u00fa bizalm\u00e1\u00e9rt, \u00e9s ismertette a Daming International leg\u00fajabb fejleszt\u00e9seit. Mint vezet\u0151 f\u00e9mfeldolgoz\u00f3 \u00e9s neh\u00e9zg\u00e9pgy\u00e1rt\u00f3 v\u00e1llalat, a Daming International az elm\u00falt \u00e9vekben gyorsan b\u0151v\u00fclt, er\u0151s glob\u00e1lis jelenl\u00e9tet \u00e9p\u00edtett ki, \u00e9s h\u00edrnevet szerzett prec\u00edzi\u00f3s gy\u00e1rt\u00e1sr\u00f3l, magas sz\u00ednvonal\u00fa min\u0151s\u00e9gi rendszerekr\u0151l \u00e9s rugalmas \u00fcgyf\u00e9lszolg\u00e1latr\u00f3l.<\/p>\n<p style=\"text-align: justify;\">A Daming Heavy Industry Group, a Daming International high-end g\u00e9pgy\u00e1rt\u00f3 sz\u00e1rnya, k\u00fcl\u00f6n\u00f6sen kulcsfontoss\u00e1g\u00fa szerepet j\u00e1tszott az olyan szektorok \u00fcgyfeleinek t\u00e1mogat\u00e1s\u00e1ban, mint az energia- \u00e9s teljes\u00edtm\u00e9ny-termel\u00e9s, petrok\u00e9mia, tenger\u00e9szeti m\u00e9rn\u00f6ks\u00e9g \u00e9s \u00faj energia. Az automatiz\u00e1lt hegeszt\u00e9sbe, digit\u00e1lis gy\u00e1rt\u00e1stechnol\u00f3gi\u00e1ba, nagy\u00fczemi forg\u00e1csol\u00f3 berendez\u00e9sekbe \u00e9s fejlett nemdestrukt\u00edv vizsg\u00e1lati k\u00e9pess\u00e9gekbe val\u00f3 folyamatos beruh\u00e1z\u00e1sokkal a Daming jelent\u0151sen b\u0151v\u00edtette komplex, magas specifik\u00e1ci\u00f3j\u00fa alkatr\u00e9szek sz\u00e1ll\u00edt\u00e1si k\u00e9pess\u00e9g\u00e9t turbin\u00e1khoz, kaz\u00e1nokhoz, nyom\u00e1sed\u00e9nyekhez \u00e9s m\u00e1s kritikus energiaeszk\u00f6z\u00f6kh\u00f6z.<\/p>\n<p style=\"text-align: justify;\">\n<h3 style=\"text-align: justify;\"><strong>Kapacit\u00e1s-b\u0151v\u00edt\u00e9s a n\u00f6vekv\u0151 ipari kereslet t\u00e1mogat\u00e1s\u00e1ra<\/strong><\/h3>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Zhou eln\u00f6k megjegyezte, hogy a folyamatosan n\u00f6vekv\u0151 energia- \u00e9s teljes\u00edtm\u00e9nyipari megrendel\u00e9sekkel szemben a Daming Heavy Industry Group m\u00e9ly\u00edteni fogja az egy\u00fcttm\u0171k\u00f6d\u00e9st a GE Vernov\u00e1val \u00faj gy\u00e1r-b\u0151v\u00edt\u00e9sek, fejlesztett g\u00e9psorok \u00e9s er\u0151s\u00edtett m\u00e9rn\u00f6ki csapatok r\u00e9v\u00e9n. Ezek a kezdem\u00e9nyez\u00e9sek arra ir\u00e1nyulnak, hogy t\u00e1mogass\u00e1k a magas min\u0151s\u00e9g\u0171, nagy pontoss\u00e1g\u00fa energiaeszk\u00f6z\u00f6k n\u00f6vekv\u0151 kereslet\u00e9t, mik\u00f6zben tov\u00e1bbra is \u00f6sszhangban maradjanak a GE Vernova glob\u00e1lis ell\u00e1t\u00e1si l\u00e1nc\u00e1nak elv\u00e1r\u00e1saival. Zhou hangs\u00falyozta, hogy ezek a beruh\u00e1z\u00e1sok jelent\u0151sen n\u00f6velik a Daming gy\u00e1rt\u00e1si rugalmass\u00e1g\u00e1t, m\u0171szaki erej\u00e9t \u00e9s sz\u00e1ll\u00edt\u00e1si kapacit\u00e1s\u00e1t, biztos\u00edtva a GE Vernova vil\u00e1gszerte zajl\u00f3 projektek konzisztens \u00e9s megb\u00edzhat\u00f3 t\u00e1mogat\u00e1s\u00e1t.<\/p>\n<p style=\"text-align: justify;\">\n<h3 style=\"text-align: justify;\"><strong>Partners\u00e9g er\u0151s\u00edt\u00e9se innov\u00e1ci\u00f3val \u00e9s integr\u00e1lt szolg\u00e1ltat\u00e1sokkal<\/strong><\/h3>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Mindk\u00e9t f\u00e9l meger\u0151s\u00edtette az elk\u00f6telezetts\u00e9g\u00e9t az innovat\u00edv egy\u00fcttm\u0171k\u00f6d\u00e9si modellek \u00e9s a region\u00e1lis szinergi\u00e1k m\u00e9ly\u00edt\u00e9se r\u00e9v\u00e9n t\u00f6rt\u00e9n\u0151 egy\u00fcttm\u0171k\u00f6d\u00e9s er\u0151s\u00edt\u00e9se mellett. Ez mag\u00e1ban foglalja a helyi szolg\u00e1ltat\u00e1si k\u00e9pess\u00e9gek felt\u00e1r\u00e1s\u00e1t, a gy\u00e1rt\u00e1si munkafolyamatok optimaliz\u00e1l\u00e1s\u00e1t \u00e9s a k\u00e9t c\u00e9g er\u0151ss\u00e9geinek kihaszn\u00e1l\u00e1s\u00e1t egy rugalmasabb, hat\u00e9konyabb \u00e9s \u00e1tl\u00e1that\u00f3bb ell\u00e1t\u00f3l\u00e1nc l\u00e9trehoz\u00e1s\u00e1ra.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">A megbesz\u00e9l\u00e9sek sor\u00e1n kiemelt\u00e9k a k\u00f6lcs\u00f6n\u00f6s \u00e9rdekl\u0151d\u00e9st a m\u00e9rn\u00f6ki egy\u00fcttm\u0171k\u00f6d\u00e9s el\u0151mozd\u00edt\u00e1sa, a korai szakasz\u00fa technikai kommunik\u00e1ci\u00f3 jav\u00edt\u00e1sa \u00e9s a hossz\u00fa t\u00e1v\u00fa kapacit\u00e1s-megold\u00e1sok k\u00f6z\u00f6s fejleszt\u00e9se \u00e9rdek\u00e9ben, hogy t\u00e1mogass\u00e1k a GE Vernova term\u00e9k\u00fatj\u00e1t.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">A szorosabb integr\u00e1ci\u00f3 \u00e9s a konzisztens kommunik\u00e1ci\u00f3 r\u00e9v\u00e9n mindk\u00e9t f\u00e9l c\u00e9lja, hogy stabil, hat\u00e9kony \u00e9s magas min\u0151s\u00e9g\u0171 sz\u00e1ll\u00edt\u00e1st biztos\u00edtson minden folyamatban l\u00e9v\u0151 \u00e9s j\u00f6v\u0151beli projekt sz\u00e1m\u00e1ra \u2013 k\u00fcl\u00f6n\u00f6sen azok sz\u00e1m\u00e1ra, amelyek a gyorsan fejl\u0151d\u0151 glob\u00e1lis energia- \u00e9s teljes\u00edtm\u00e9nypiacokat szolg\u00e1lj\u00e1k.<\/p>\n<p style=\"text-align: justify;\">\n<h3 style=\"text-align: justify;\"><strong>K\u00f6z\u00f6s elk\u00f6telezetts\u00e9g a karbonmentes j\u00f6v\u0151\u00e9rt<\/strong><\/h3>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">A j\u00f6v\u0151re tekintve a Daming International \u00e9s a GE Vernova v\u00e1llalta, hogy tov\u00e1bb b\u0151v\u00edti partners\u00e9g\u00fcket a glob\u00e1lis energia\u00e1tmenet kih\u00edv\u00e1sainak \u00e9s lehet\u0151s\u00e9geinek megfelel\u0151en. A GE Vernova energia-technol\u00f3giai vezet\u0151 szerep\u00e9vel \u00e9s a Daming n\u00f6vekv\u0151 gy\u00e1rt\u00e1si k\u00e9pess\u00e9geivel mindk\u00e9t szervezet jelent\u0151s szerepet j\u00e1tszik a tiszt\u00e1bb, hat\u00e9konyabb \u00e9s karbonmentesebb energia-megold\u00e1sok t\u00e1mogat\u00e1s\u00e1ban vil\u00e1gszerte.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Egy\u00fctt a Daming \u00e9s a GE Vernova c\u00e9lja, hogy hozz\u00e1j\u00e1ruljon a glob\u00e1lis energiaipar hossz\u00fa t\u00e1v\u00fa fenntarthat\u00f3s\u00e1g\u00e1hoz \u00e9s moderniz\u00e1ci\u00f3j\u00e1hoz \u2013 biztos\u00edtva megb\u00edzhat\u00f3, nagy teljes\u00edtm\u00e9ny\u0171 eszk\u00f6z-ell\u00e1t\u00e1st, mik\u00f6zben t\u00e1mogatja a vil\u00e1g \u00e1tmenet\u00e9t egy z\u00f6ldebb j\u00f6v\u0151 fel\u00e9.<\/p>","protected":false},"excerpt":{"rendered":"<p>A senior delegation from Daming International, led by Chairman Zhou Keming, visited GE Vernova\u2019s Baden office to further strengthen cooperation in the global energy equipment supply chain. The delegation included Johnny Fornstedt, General Manager of the Daming Europe; Chen Ning, President of Daming Heavy Industry; Wang Xi, General Manager of\u00a0Daming\u00a0Energy Equipment; and Wang Xuming, Deputy [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2188,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[456],"tags":[457,778,780,779],"class_list":["post-2187","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-partner","tag-daming-international","tag-ge-vernova","tag-power-generation","tag-steam-turbine"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/posts\/2187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/comments?post=2187"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/posts\/2187\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/media\/2188"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/media?parent=2187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/categories?post=2187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/tags?post=2187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}