{"id":1663,"date":"2025-05-13T17:40:59","date_gmt":"2025-05-13T09:40:59","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=1663"},"modified":"2025-05-13T17:40:59","modified_gmt":"2025-05-13T09:40:59","slug":"another-lng-project-daming-participated-finishes-dome-lifting-in-yanan","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/hu\/another-lng-project-daming-participated-finishes-dome-lifting-in-yanan\/","title":{"rendered":"Egy m\u00e1sik LNG projekt Daming r\u00e9szt vett befejezi a kupola emel\u00e9s\u00e9t Yan'anban"},"content":{"rendered":"<p style=\"text-align: justify;\">A Shaanxi Yanchang Petroleum Yan\u2019an LNG-projektje, amelyet \u00e1ltal\u00e1ban a Pekingi Petrok\u00e9miai M\u00e9rn\u00f6kirod\u00e1val szerz\u0151dtek meg, jelent\u0151s halad\u00e1st \u00e9rt el.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1665\" aria-describedby=\"caption-attachment-1665\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1665\" title=\"Az LNG-tank kupol\u00e1j\u00e1nak emel\u00e9se befejez\u0151d\u00f6tt Yan\u2019anban\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1024x576.jpg\" alt=\"Az LNG-tank kupol\u00e1j\u00e1nak emel\u00e9se befejez\u0151d\u00f6tt Yan\u2019anban\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1024x576.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-300x169.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-768x432.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1536x864.jpg 1536w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-2048x1152.jpg 2048w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-18x10.jpg 18w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1665\" class=\"wp-caption-text\">Az LNG-tank kupol\u00e1j\u00e1nak emel\u00e9se befejez\u0151d\u00f6tt Yan\u2019anban<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">K\u00e9t 50.000 m\u00b3 kapacit\u00e1s\u00fa LNG-tart\u00e1ly sikeresen v\u00e9grehajtotta a dupla tart\u00e1ly szinkronos kupol\u00e1j\u00e1nak emel\u00e9s\u00e9nek kulcsfontoss\u00e1g\u00fa folyamat\u00e1t, ami jelzi a projekt f\u0151 szerkezeti \u00e9p\u00edt\u00e9s\u00e9nek befejez\u0151d\u00e9s\u00e9t \u00e9s a form\u00e1lis bels\u0151 tart\u00e1lyok telep\u00edt\u00e9si szakaszba val\u00f3 l\u00e9p\u00e9st, er\u0151s alapot teremtve a tov\u00e1bbi \u00fczembe helyez\u00e9sre \u00e9s m\u0171k\u00f6dtet\u00e9sre.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">A Jingjiang Daming kihaszn\u00e1lta er\u0151ss\u00e9geit \u00e9s 7.000 tonna 9% nikkelac\u00e9l el\u0151gy\u00e1rtm\u00e1nyt sz\u00e1ll\u00edtott az LNG-tart\u00e1lyhoz, bele\u00e9rtve a bels\u0151 \u00e9s k\u00fcls\u0151 h\u00e9j falpaneleit \u00e9s alaplemezeit, ism\u00e9t bizony\u00edtva a Daming szolg\u00e1ltat\u00e1si erej\u00e9t ezen a ter\u00fcleten.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">A Daming \u00e9s partnerei, a Pekingi Petrok\u00e9miai M\u00e9rn\u00f6kiroda \u00e9s a CITIC Pacific Special Steel szint\u00e9n megh\u00edv\u00e1st kaptak a cerem\u00f3ni\u00e1ra, hogy tan\u00fai legyenek ennek a kooperat\u00edv eredm\u00e9nynek a nagy pillanat\u00e1nak.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1664\" aria-describedby=\"caption-attachment-1664\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1664\" title=\"A Daming 7000 tonna 9 nikkelac\u00e9lt sz\u00e1ll\u00edtott\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-1024x576.png\" alt=\"A Daming 7000 tonna 9 nikkelac\u00e9lt sz\u00e1ll\u00edtott\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-1024x576.png 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-300x169.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-768x432.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-18x10.png 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel.png 1080w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1664\" class=\"wp-caption-text\">A Daming 7000 tonna 9 nikkelac\u00e9lt sz\u00e1ll\u00edtott<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Az LNG-tart\u00e1ly \u00e9p\u00edt\u00e9s\u00e9nek legkifog\u00e1sosabb r\u00e9szek\u00e9nt a pneumatikus emel\u00e9si folyamat rendk\u00edv\u00fcl neh\u00e9z \u00e9s kock\u00e1zatos. Az 1. \u00e9s 2. tart\u00e1lyok kupol\u00e1j\u00e1nak emel\u00e9s\u00e9hez fejlett bimet\u00e1lis teljes kapacit\u00e1s\u00fa szerkezetet alkalmaztak, a k\u00fcls\u0151 tart\u00e1ly bels\u0151 \u00e1tm\u00e9r\u0151je 52 m\u00e9terre, a boltozat ny\u00edl\u00e1sa pedig 51,8 m\u00e9terre terjed. A 2 \u00f3ra 18 perces prec\u00edzi\u00f3s m\u0171velet sor\u00e1n egyenk\u00e9nt 457,37 tonn\u00e1s tart\u00e1ly kupol\u00e1j\u00e1t siker\u00fclt 29,57 m\u00e9ter magasra sim\u00e1n emelni, \u00e9s v\u00e9g\u00fcl pontosan \u00f6sszeillesztett\u00e9k a nyom\u00e1sgy\u0171r\u0171vel, er\u0151s alapot teremtve a 3. \u00e9s 4. tart\u00e1ly kupol\u00e1j\u00e1nak tov\u00e1bbi emel\u00e9s\u00e9hez.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1666\" aria-describedby=\"caption-attachment-1666\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1666\" title=\"A Daming r\u00e9szt vett az Yanan LNG-projekt kupol\u00e1j\u00e1nak emel\u00e9si cerem\u00f3ni\u00e1j\u00e1n\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1024x768.jpg\" alt=\"A Daming r\u00e9szt vett az Yanan LNG-projekt kupol\u00e1j\u00e1nak emel\u00e9si cerem\u00f3ni\u00e1j\u00e1n\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1024x768.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-300x225.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-768x576.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1536x1152.jpg 1536w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-2048x1536.jpg 2048w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-16x12.jpg 16w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1666\" class=\"wp-caption-text\">A Daming r\u00e9szt vett az Yanan LNG-projekt kupol\u00e1j\u00e1nak emel\u00e9si cerem\u00f3ni\u00e1j\u00e1n<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Yan\u2019an egyik kulcsfontoss\u00e1g\u00fa lakhat\u00e1si projektjek\u00e9nt a projekt \u00e9vi 400.000 tonna LNG-el\u0151\u00e1ll\u00edt\u00e1st tervez. A projekt befejez\u00e9se ut\u00e1n hat\u00e9konyan megoldja Yan\u2019an \u00e9s k\u00f6rny\u00e9kbeli lakosainak g\u00e1zsz\u00fcks\u00e9glet\u00e9t, tov\u00e1bb cs\u00f6kkenti a sz\u00e9n-dioxid-kibocs\u00e1t\u00e1st, \u00e9s nagy jelent\u0151s\u00e9ggel b\u00edr a region\u00e1lis energiastrukt\u00fara optimaliz\u00e1l\u00e1s\u00e1ban, az emberek g\u00e1zfogyaszt\u00e1s\u00e1nak biztons\u00e1g\u00e1nak garant\u00e1l\u00e1s\u00e1ban \u00e9s az \u00f6reg forradalmi ter\u00fclet z\u00f6ld fejl\u0151d\u00e9s\u00e9nek el\u0151seg\u00edt\u00e9s\u00e9ben.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Eddig a Daming t\u00f6bb mint 70 LNG-tart\u00e1lynak szolg\u00e1lt, \u00e9s t\u00f6bb mint 100.000 tonna anyagot gy\u00e1rtott \u00e9s dolgozott fel, lefedve t\u00f6bb mint 40% LNG-fogad\u00f3 termin\u00e1lt Guangxit\u00f3l Tianjin Caofeidianig, ami az LNG-projektek helysz\u00edneinek egy\u00f6ntet\u0171 elismer\u00e9s\u00e9t nyerte el, \u00e9s a j\u00f6v\u0151ben fokozatosan fejleszti majd a tengerent\u00fali LNG-projekteket \u00e9s f\u00f6ldi LNG-fogad\u00f3 termin\u00e1l projekteket.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Shaanxi Yanchang Petroleum\u2019s Yan&#8217;an LNG Project, which was generally contracted by Beijing Petrochemical Engineering, has made significant progress. Two 50,000 m\u00b3 LNG storage tanks have successfully completed the key process of double tank synchronous dome lifting, marking the completion of the main structure construction of the project and the formal entry into the internal [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1665,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[468],"tags":[580,457,578,579,476],"class_list":["post-1663","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-damings-products","tag-beijing-petrochemical-engineering","tag-daming-international","tag-jingjiang-daming","tag-lng-receiving-terminal","tag-lng-tank"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/posts\/1663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/comments?post=1663"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/posts\/1663\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/media\/1665"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/media?parent=1663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/categories?post=1663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/hu\/wp-json\/wp\/v2\/tags?post=1663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}