{"id":2381,"date":"2025-12-31T16:32:51","date_gmt":"2025-12-31T08:32:51","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=2381"},"modified":"2025-12-31T16:32:51","modified_gmt":"2025-12-31T08:32:51","slug":"jingjiang-daming-breaks-new-ground-in-machining-ultra-long-steel-plates","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/fr\/jingjiang-daming-breaks-new-ground-in-machining-ultra-long-steel-plates\/","title":{"rendered":"Jingjiang Daming Breaks New Ground in Machining Ultra-Long Steel Plates"},"content":{"rendered":"<p style=\"text-align: justify;\" data-start=\"248\" data-end=\"733\">Jingjiang Daming recently completed a major milestone by efficiently processing over 1,000 tons of heavy steel structure export orders. These were no ordinary steel components\u2014the longest plates exceeded 16.3 meters, with an incredible length-to-width ratio of 47:1, and thicknesses ranging from 25 to 60 mm. The project had a tight one-month deadline, and the customer required extremely high standards for dimensional accuracy, straightness, and surface and cross-section markings.<\/p>\n<p data-start=\"248\" data-end=\"733\">\n<figure id=\"attachment_2383\" aria-describedby=\"caption-attachment-2383\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-large wp-image-2383\" title=\"Ultra Long Steel Plates Produced by Daming\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Ultra-Long-Steel-Plates-Produced-by-Daming-1024x576.jpg\" alt=\"Ultra Long Steel Plates Produced by Daming\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Ultra-Long-Steel-Plates-Produced-by-Daming-1024x576.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Ultra-Long-Steel-Plates-Produced-by-Daming-300x169.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Ultra-Long-Steel-Plates-Produced-by-Daming-768x432.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Ultra-Long-Steel-Plates-Produced-by-Daming-18x10.jpg 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Ultra-Long-Steel-Plates-Produced-by-Daming.jpg 1198w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-2383\" class=\"wp-caption-text\">Ultra Long Steel Plates Produced by Daming<\/figcaption><\/figure>\n<p data-start=\"248\" data-end=\"733\">\n<p style=\"text-align: justify;\" data-start=\"735\" data-end=\"1062\">Despite the technical challenges and time pressure, Jingjiang Daming not only delivered on quality but also set a new benchmark in production efficiency. The first batch of 600 tons was cut in just two weeks, showcasing the company\u2019s strong technical capabilities and its leading position in the heavy steel processing field.<\/p>\n<p data-start=\"735\" data-end=\"1062\">\n<p style=\"text-align: justify;\" data-start=\"1064\" data-end=\"1133\"><strong data-start=\"1064\" data-end=\"1131\">Smart Planning and Advanced Equipment Drive Precision and Speed<\/strong><\/p>\n<p style=\"text-align: justify;\" data-start=\"1135\" data-end=\"1643\">From the start, all departments worked together seamlessly. A special coordination meeting helped the team analyze challenges and plan solutions that balanced speed and precision. The solution: a 28-meter \u00d7 8-meter CNC precision cutting table equipped with a multi-torch flame cutting system. This allowed multiple plates to be cut at the same time with several torches, dramatically improving efficiency. At the same time, the system ensured straightness and minimized defects, even for ultra-long plates.<\/p>\n<p data-start=\"1135\" data-end=\"1643\">\n<figure id=\"attachment_2382\" aria-describedby=\"caption-attachment-2382\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"size-large wp-image-2382\" title=\"Multi Torch Flame Cutting System\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Multi-Torch-Flame-Cutting-System-1024x661.jpg\" alt=\"Multi Torch Flame Cutting System\" width=\"800\" height=\"516\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Multi-Torch-Flame-Cutting-System-1024x661.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Multi-Torch-Flame-Cutting-System-300x194.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Multi-Torch-Flame-Cutting-System-768x496.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Multi-Torch-Flame-Cutting-System-18x12.jpg 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/12\/Multi-Torch-Flame-Cutting-System.jpg 1273w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-2382\" class=\"wp-caption-text\">Multi Torch Flame Cutting System<\/figcaption><\/figure>\n<p data-start=\"1135\" data-end=\"1643\">\n<p style=\"text-align: justify;\" data-start=\"1645\" data-end=\"1912\">Because these plates were special-sized and made from specific materials, experienced operators were assigned, and a double-check system for torch spacing was implemented before every cut. This \u201cdouble assurance\u201d guaranteed precise cutting and high-quality results.<\/p>\n<p data-start=\"1645\" data-end=\"1912\">\n<p style=\"text-align: justify;\" data-start=\"1914\" data-end=\"1968\"><strong data-start=\"1914\" data-end=\"1966\">Innovative Workflow Solves Logistical Challenges<\/strong><\/p>\n<p style=\"text-align: justify;\" data-start=\"1970\" data-end=\"2411\">Handling ultra-long plates presents logistical difficulties, from lifting and moving to space management. Jingjiang Daming tackled this by moving away from traditional linear workflows. Instead, grinding, marking, straightening, and packaging were carried out simultaneously in a coordinated \u201cparallel\u201d process. A detailed daily plan minimized waiting times and repeated handling, creating a smooth, compact, and efficient production flow.<\/p>\n<p data-start=\"1970\" data-end=\"2411\">\n<p style=\"text-align: justify;\" data-start=\"2413\" data-end=\"2463\"><strong data-start=\"2413\" data-end=\"2461\">Customer Approval Confirms Global Competence<\/strong><\/p>\n<p style=\"text-align: justify;\" data-start=\"2465\" data-end=\"2815\">Thanks to careful planning, advanced equipment, and teamwork, the first batch of 600 tons received full customer approval, setting the stage for on-time completion of the entire order. This project highlights Jingjiang Daming\u2019s ability to handle high-end, special, and urgent orders and reinforces its strong reputation in the international market.<\/p>\n<p data-start=\"2465\" data-end=\"2815\">\n<p style=\"text-align: justify;\" data-start=\"2817\" data-end=\"3037\">With every successful project like this, Jingjiang Daming proves it can overcome even the most demanding technical and logistical challenges, delivering high-quality heavy steel solutions to customers around the world.<\/p>","protected":false},"excerpt":{"rendered":"<p>Jingjiang Daming recently completed a major milestone by efficiently processing over 1,000 tons of heavy steel structure export orders. These were no ordinary steel components\u2014the longest plates exceeded 16.3 meters, with an incredible length-to-width ratio of 47:1, and thicknesses ranging from 25 to 60 mm. The project had a tight one-month deadline, and the customer [&hellip;]<\/p>","protected":false},"author":4,"featured_media":2384,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[468],"tags":[825,457,824,823],"class_list":["post-2381","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-damings-products","tag-carbon-steel-plates","tag-daming-international","tag-stainless-steel-plates","tag-ultra-long-steel-plates"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/posts\/2381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/comments?post=2381"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/posts\/2381\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/media\/2384"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/media?parent=2381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/categories?post=2381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/tags?post=2381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}