{"id":1663,"date":"2025-05-13T17:40:59","date_gmt":"2025-05-13T09:40:59","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=1663"},"modified":"2025-05-13T17:40:59","modified_gmt":"2025-05-13T09:40:59","slug":"another-lng-project-daming-participated-finishes-dome-lifting-in-yanan","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/fr\/another-lng-project-daming-participated-finishes-dome-lifting-in-yanan\/","title":{"rendered":"Le levage du d\u00f4me d'un autre projet GNL auquel Daming a particip\u00e9 s'ach\u00e8ve \u00e0 Yan'an"},"content":{"rendered":"<p style=\"text-align: justify;\">Le projet de GNL de Yan\u2019an de Shaanxi Yanchang Petroleum, g\u00e9n\u00e9ralement sous-trait\u00e9 \u00e0 Beijing Petrochemical Engineering, a r\u00e9alis\u00e9 des progr\u00e8s significatifs.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1665\" aria-describedby=\"caption-attachment-1665\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1665\" title=\"La lev\u00e9e des d\u00f4mes des r\u00e9servoirs GNL s\u2019ach\u00e8ve \u00e0 Yan\u2019an\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1024x576.jpg\" alt=\"Le levage du d\u00f4me du r\u00e9servoir LNG s\u2019ach\u00e8ve \u00e0 Yan\u2019an\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1024x576.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-300x169.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-768x432.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1536x864.jpg 1536w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-2048x1152.jpg 2048w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-18x10.jpg 18w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1665\" class=\"wp-caption-text\">La lev\u00e9e des d\u00f4mes des r\u00e9servoirs GNL s\u2019ach\u00e8ve \u00e0 Yan\u2019an<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Deux r\u00e9servoirs de stockage GNL de 50 000 m\u00b3 chacun ont achev\u00e9 avec succ\u00e8s le processus cl\u00e9 de lev\u00e9e synchrone des deux d\u00f4mes, marquant ainsi l\u2019ach\u00e8vement de la construction de la structure principale du projet et l\u2019entr\u00e9e formelle dans la phase d\u2019installation interne des r\u00e9servoirs, posant ainsi une base solide pour la mise en service et l\u2019exploitation ult\u00e9rieure du projet.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Jingjiang Daming a mis \u00e0 profit ses forces et fourni 7 000 tonnes d\u2019acier au nickel 9% pr\u00e9fabriqu\u00e9 pour le r\u00e9servoir de stockage GNL, incluant les panneaux de paroi et les dalles de fond des coques interne et externe, d\u00e9montrant une fois de plus la force de service de Daming dans ce domaine.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Daming et ses partenaires, Beijing Petroleum Engineering et CITIC Pacific Special Steel, ont \u00e9galement \u00e9t\u00e9 invit\u00e9s \u00e0 assister \u00e0 la c\u00e9r\u00e9monie pour \u00eatre t\u00e9moins de ce grand moment de coop\u00e9ration.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1664\" aria-describedby=\"caption-attachment-1664\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1664\" title=\"Daming a fourni 7 000 tonnes d\u2019acier au nickel 9\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-1024x576.png\" alt=\"Daming a fourni 7 000 tonnes d\u2019acier au nickel 9\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-1024x576.png 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-300x169.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-768x432.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-18x10.png 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel.png 1080w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1664\" class=\"wp-caption-text\">Daming a fourni 7 000 tonnes d\u2019acier au nickel 9<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">En tant que partie la plus complexe du processus de construction des r\u00e9servoirs GNL, le proc\u00e9d\u00e9 de lev\u00e9e pneumatique est extr\u00eamement difficile et risqu\u00e9. Les r\u00e9servoirs n\u00b01 et n\u00b02 destin\u00e9s \u00e0 la lev\u00e9e des d\u00f4mes adoptent une structure bim\u00e9tallique avanc\u00e9e \u00e0 pleine capacit\u00e9 ; le diam\u00e8tre int\u00e9rieur du r\u00e9servoir ext\u00e9rieur atteint 52 m\u00e8tres et l\u2019envergure de la vo\u00fbte 51,8 m\u00e8tres. Lors de cette op\u00e9ration de pr\u00e9cision qui a dur\u00e9 2 heures et 18 minutes, le d\u00f4me du r\u00e9servoir pesant 457,37 tonnes par unit\u00e9 a \u00e9t\u00e9 soulev\u00e9 avec succ\u00e8s sur une hauteur de 29,57 m\u00e8tres, r\u00e9alisant ainsi un amarrage pr\u00e9cis avec l\u2019anneau de pression, ce qui pose une base solide pour la lev\u00e9e ult\u00e9rieure des d\u00f4mes des r\u00e9servoirs n\u00b03 et n\u00b04.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1666\" aria-describedby=\"caption-attachment-1666\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1666\" title=\"Daming a assist\u00e9 \u00e0 la c\u00e9r\u00e9monie de lev\u00e9e des d\u00f4mes du projet GNL de Yan\u2019an\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1024x768.jpg\" alt=\"Daming a assist\u00e9 \u00e0 la c\u00e9r\u00e9monie de lev\u00e9e des d\u00f4mes du projet GNL de Yan\u2019an\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1024x768.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-300x225.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-768x576.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1536x1152.jpg 1536w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-2048x1536.jpg 2048w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-16x12.jpg 16w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1666\" class=\"wp-caption-text\">Daming a assist\u00e9 \u00e0 la c\u00e9r\u00e9monie de lev\u00e9e des d\u00f4mes du projet GNL de Yan\u2019an<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">En tant que projet cl\u00e9 pour le bien-\u00eatre des habitants de Yan\u2019an, ce projet est con\u00e7u pour produire annuellement 400 000 tonnes de GNL. Une fois achev\u00e9, il permettra de r\u00e9pondre efficacement \u00e0 la demande en gaz des habitants de Yan\u2019an et des r\u00e9gions environnantes, continuera \u00e0 r\u00e9duire les \u00e9missions de carbone et rev\u00eat une grande importance pour optimiser la structure \u00e9nerg\u00e9tique r\u00e9gionale, garantir la s\u00e9curit\u00e9 de la consommation de gaz des populations et promouvoir le d\u00e9veloppement vert de cette ancienne r\u00e9gion r\u00e9volutionnaire.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\u00c0 ce jour, Daming a servi plus de 70 r\u00e9servoirs GNL et plus de 100 000 tonnes de mat\u00e9riaux pr\u00e9fabriqu\u00e9s et trait\u00e9s, couvrant plus de 40% de terminaux m\u00e9thaniers du Guangxi jusqu\u2019\u00e0 Caofeidian \u00e0 Tianjin, ce qui lui a valu une reconnaissance unanime des sites de projets GNL. \u00c0 l\u2019avenir, Daming d\u00e9veloppera progressivement des projets GNL \u00e0 l\u2019\u00e9tranger ainsi que des projets de terminaux m\u00e9thaniers terrestres.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Shaanxi Yanchang Petroleum\u2019s Yan&#8217;an LNG Project, which was generally contracted by Beijing Petrochemical Engineering, has made significant progress. Two 50,000 m\u00b3 LNG storage tanks have successfully completed the key process of double tank synchronous dome lifting, marking the completion of the main structure construction of the project and the formal entry into the internal [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1665,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[468],"tags":[580,457,578,579,476],"class_list":["post-1663","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-damings-products","tag-beijing-petrochemical-engineering","tag-daming-international","tag-jingjiang-daming","tag-lng-receiving-terminal","tag-lng-tank"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/posts\/1663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/comments?post=1663"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/posts\/1663\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/media\/1665"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/media?parent=1663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/categories?post=1663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/fr\/wp-json\/wp\/v2\/tags?post=1663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}