{"id":2646,"date":"2026-04-29T17:01:53","date_gmt":"2026-04-29T09:01:53","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=2646"},"modified":"2026-04-29T17:05:14","modified_gmt":"2026-04-29T09:05:14","slug":"daming-workshop-team-honored-as-national-worker-pioneer","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/fi\/daming-workshop-team-honored-as-national-worker-pioneer\/","title":{"rendered":"Daming Workshop Team Honored as \u201cNational Worker Pioneer\u201d"},"content":{"rendered":"<p class=\"isSelectedEnd\" style=\"text-align: justify;\">On April 28, 2026, the China Federation of Trade Unions released its official decision recognizing recipients of the 2026 National May Day Labor Medals. Among the 1,183 honorees nationwide, four teams from Wuxi City were awarded the prestigious title of \u201cNational Worker Pioneer.\u201d Notably, Team C of the Cutting Workshop under Production Department 2 at Jiangsu Daming stood out\u2014marking another milestone achievement following its earlier recognition as a \u201cJiangsu Provincial Worker Pioneer\u201d in 2010.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_2648\" aria-describedby=\"caption-attachment-2648\" style=\"width: 1324px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-2648\" title=\"Team C of the Cutting Workshop under Production Department 2 at Jiangsu Daming 1\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-under-Production-Department-2-at-Jiangsu-Daming-1.jpg\" alt=\"Team C of the Cutting Workshop under Production Department 2 at Jiangsu Daming 1\" width=\"1324\" height=\"879\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-under-Production-Department-2-at-Jiangsu-Daming-1.jpg 1324w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-under-Production-Department-2-at-Jiangsu-Daming-1-300x199.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-under-Production-Department-2-at-Jiangsu-Daming-1-1024x680.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-under-Production-Department-2-at-Jiangsu-Daming-1-768x510.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-under-Production-Department-2-at-Jiangsu-Daming-1-18x12.jpg 18w\" sizes=\"auto, (max-width: 1324px) 100vw, 1324px\" \/><figcaption id=\"caption-attachment-2648\" class=\"wp-caption-text\">Team C of the Cutting Workshop under Production Department 2 at Jiangsu Daming<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\">Established on June 30, 2008, Team C has evolved into a cornerstone of technical excellence within the Daming Workshop. Built on a foundation of craftsmanship and innovation, the team has grown into a high-performing unit comprising eight members, including a dynamic mix of experienced professionals, young talent born in the 1990s, and female technical experts. This balanced composition has enabled the team to consistently deliver outstanding results across complex and demanding production tasks.<\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\"><strong>Driving Excellence Through Innovation and Precision<\/strong><\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\">Team C has developed a robust \u201csupport\u2013breakthrough\u2013benchmark\u201d operational framework that has proven instrumental in tackling major industrial projects. The team has contributed to high-profile initiatives such as the Jinjing project, antimony plate processing, and China National Nuclear Corporation (CNNC) assignments. Faced with stringent technical requirements, tight deadlines, and high precision standards, the team has maintained a relentless focus on optimizing process parameters and standardizing operational procedures.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_2650\" aria-describedby=\"caption-attachment-2650\" style=\"width: 1315px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-2650\" title=\"Team C of the Cutting Workshop in Production Department 2 at Jiangsu Daming\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-in-Production-Department-2-at-Jiangsu-Daming.jpg\" alt=\"Team C of the Cutting Workshop in Production Department 2 at Jiangsu Daming\" width=\"1315\" height=\"856\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-in-Production-Department-2-at-Jiangsu-Daming.jpg 1315w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-in-Production-Department-2-at-Jiangsu-Daming-300x195.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-in-Production-Department-2-at-Jiangsu-Daming-1024x667.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-in-Production-Department-2-at-Jiangsu-Daming-768x500.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-C-of-the-Cutting-Workshop-in-Production-Department-2-at-Jiangsu-Daming-18x12.jpg 18w\" sizes=\"auto, (max-width: 1315px) 100vw, 1315px\" \/><figcaption id=\"caption-attachment-2650\" class=\"wp-caption-text\">Team C of the Cutting Workshop in Production Department 2 at Jiangsu Daming<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\">In one notable case involving a nuclear power project, the team overcame significant cutting challenges posed by thick materials and hardened edges. By refining the sawing machine process route, they significantly improved production yield\u2014demonstrating both technical ingenuity and execution excellence.<\/p>\n<p>&nbsp;<\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\">The introduction of a 60,000-watt laser cutting machine in 2024 marked another leap forward. Under the leadership of Team Leader Tai Pinghua, Team C rapidly mastered the advanced equipment through an integrated \u201ctheory + practice\u201d training approach. During the trial phase, the team successfully completed cutting operations for 100mm thick plates and fulfilled multiple orders with high efficiency. In a particularly complex three-dimensional titanium plate project, the team pioneered an \u201cedge-borrowing cutting\u201d solution, achieving a 100% product qualification rate while enhancing material utilization and customer satisfaction.<\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\"><strong>Pursuing Quality, Efficiency, and Industry Leadership<\/strong><\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\">Team C\u2019s commitment to excellence is reflected in its meticulous quality control processes. Team member Luo Xianfei rigorously applies a five-step verification system\u2014covering raw materials, procedures, drawings, equipment, and first-piece inspection\u2014to ensure zero-defect delivery. In a challenging washing tower project involving specialized materials, the team implemented a closed-loop management system that achieved a 100% pass rate during client inspection, earning high praise.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_2651\" aria-describedby=\"caption-attachment-2651\" style=\"width: 952px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-2651\" title=\"Team Leader Tai Pinghua 1\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-Leader-Tai-Pinghua-1.jpg\" alt=\"Team Leader Tai Pinghua 1\" width=\"952\" height=\"650\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-Leader-Tai-Pinghua-1.jpg 952w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-Leader-Tai-Pinghua-1-300x205.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-Leader-Tai-Pinghua-1-768x524.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Team-Leader-Tai-Pinghua-1-18x12.jpg 18w\" sizes=\"auto, (max-width: 952px) 100vw, 952px\" \/><figcaption id=\"caption-attachment-2651\" class=\"wp-caption-text\">Team Leader Tai Pinghua<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\">Innovation at the individual level continues to drive collective success. Shu Bicheng significantly improved cutting efficiency\u2014by up to 80%\u2014in a new energy vehicle component project through program optimization and tooling enhancements. Meanwhile, Lu Shouling\u2019s improvements in material layout increased per-sheet output and generated annual cost savings exceeding 500,000 yuan. Tai Pinghua also led a waterjet cutting improvement initiative that reduced material waste and extended equipment lifespan, further contributing to cost efficiency.<\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\"><strong>Cultivating Talent Through Mentorship<\/strong><\/p>\n<p class=\"isSelectedEnd\" style=\"text-align: justify;\">A defining strength of Team C lies in its commitment to talent development. The team has established a mentorship model that pairs experienced workers with newer employees, fostering knowledge transfer and skill development. Through structured job rotation and hands-on training, Team C has cultivated a versatile workforce capable of handling multiple roles with proficiency.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_2653\" aria-describedby=\"caption-attachment-2653\" style=\"width: 931px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-2653\" title=\"Luo Xianfei and Lu Shouling\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Luo-Xianfei-and-Lu-Shouling.jpg\" alt=\"Luo Xianfei and Lu Shouling\" width=\"931\" height=\"623\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Luo-Xianfei-and-Lu-Shouling.jpg 931w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Luo-Xianfei-and-Lu-Shouling-300x201.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Luo-Xianfei-and-Lu-Shouling-768x514.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/04\/Luo-Xianfei-and-Lu-Shouling-18x12.jpg 18w\" sizes=\"auto, (max-width: 931px) 100vw, 931px\" \/><figcaption id=\"caption-attachment-2653\" class=\"wp-caption-text\">Luo Xianfei and Lu Shouling<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">The team has also developed standardized training systems for advanced equipment, significantly reducing onboarding time and minimizing operational errors. This continuous cycle of mentorship and growth has positioned Team C as a talent incubator within the organization, producing skilled operators who excel in complex projects across various industries.<\/p>","protected":false},"excerpt":{"rendered":"<p>On April 28, 2026, the China Federation of Trade Unions released its official decision recognizing recipients of the 2026 National May Day Labor Medals. Among the 1,183 honorees nationwide, four teams from Wuxi City were awarded the prestigious title of \u201cNational Worker Pioneer.\u201d Notably, Team C of the Cutting Workshop under Production Department 2 at [&hellip;]<\/p>","protected":false},"author":4,"featured_media":2655,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[631],"tags":[921,457],"class_list":["post-2646","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daming-faces","tag-2026-national-may-day-labor-medals","tag-daming-international"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/posts\/2646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/comments?post=2646"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/posts\/2646\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/media\/2655"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/media?parent=2646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/categories?post=2646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/fi\/wp-json\/wp\/v2\/tags?post=2646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}