{"id":287,"date":"2022-11-10T09:35:57","date_gmt":"2022-11-10T01:35:57","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=287"},"modified":"2024-11-22T14:47:25","modified_gmt":"2024-11-22T06:47:25","slug":"daiming-manufacturing-many-containers-have-been-exported-one-after-another-one-stop-service-has-been-improved-again","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/et\/daiming-manufacturing-many-containers-have-been-exported-one-after-another-one-stop-service-has-been-improved-again\/","title":{"rendered":"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, \"\u00fche peatuse\" teenus on taas paranenud."},"content":{"rendered":"<p>P\u00e4rast esimese partii dupleksterasest torni edukat tarnimist kuulsate esmaklassiliste paberivabrikute jaoks septembri l\u00f5pus on Da Ming Heavy Industry tarninud GNA II kondensaatori Siemens Energyle, tselluloosiseadmeid, dupleksterasest reaktori eelt\u00f6\u00f6de projekte hiljuti, mis r\u00f5hutas Damingi \"\u00fche peatuse\" t\u00f6\u00f6tlemis- ja tootmisteenuseid laevade jaoks.<\/p>\r\n\r\n\r\n\r\n<p><strong>GNA II kondensaatorseadmed Siemens Energy jaoks\u00a0<\/strong><\/p>\r\n\r\n\r\n\r\n<p>Siemens Energy on tehnoloogiaettev\u00f5te, mille tegevus h\u00f5lmab kogu energia v\u00e4\u00e4rtusahelat: energiatootmine, \u00fclekanne, energiat\u00f6\u00f6stusrakendused, uued energiaallikad ja taastuvenergia. 2022. aasta jaanuaris s\u00f5lmis Siemens ametliku lepingu Da Ming Heavy Industryga, et eksportida Brasiiliasse suuremahulisi kondensaatoriseadmeid tootvaid teenuseid.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" title=\"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, &quot;\u00fche peatuse&quot; teenus on taas paranenud.\" class=\"aligncenter wp-image-251 size-full\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news1.jpg\" alt=\"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, &quot;\u00fche peatuse&quot; teenus on taas paranenud.\" width=\"667\" height=\"364\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news1.jpg 667w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news1-300x164.jpg 300w\" sizes=\"auto, (max-width: 667px) 100vw, 667px\" \/><\/figure>\r\n\r\n\r\n\r\n<p>Kogumassiga 688 tonni on see seadmekomplekt \u00fcks suurimaid Siemens Energy poolt Hiinas toodetud kondensaatoreid. Selle p\u00f5hikomponentideks on nelinurkse kujuga toruplaadid, mis sisaldavad rohkem kui 50 000 titaanist soojusvahetustoru.<\/p>\r\n\r\n\r\n\r\n<p>Da Ming Heavy Industry moodustas spetsiaalse PM-meeskonna, mis Siemens Energy meeskonna tugeva toetuse all aktiivselt \u00fcletas tootmise ajal palju raskusi, k\u00f5igi osakondade t\u00f6\u00f6tajad olid teinud palju j\u00f5upingutusi seadmete l\u00f5ppkvaliteedi saavutamiseks.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" title=\"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, &quot;\u00fche peatuse&quot; teenus on taas paranenud.\" class=\"aligncenter wp-image-252 size-full\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news22.jpg\" alt=\"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, &quot;\u00fche peatuse&quot; teenus on taas paranenud.\" width=\"638\" height=\"227\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news22.jpg 638w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u897f\u95e8\u5b50news22-300x107.jpg 300w\" sizes=\"auto, (max-width: 638px) 100vw, 638px\" \/><\/figure>\r\n\r\n\r\n\r\n<p><strong>Duplex Steel reaktori ja torni projektid paberit\u00f6\u00f6stusele<\/strong><\/p>\r\n\r\n\r\n\r\n<p>Esimesed kaks Damingi poolt rahvusvaheliselt tuntud paberit\u00f6\u00f6stusettev\u00f5ttele tarnitud tootepartiid on dupleksterasest reaktorid ja tornide eelt\u00f6\u00f6de projektid. Toetudes Da Mingi enda eelistele, oleme edukalt l\u00f5pule viinud mitmeid teenindusprotsesse alates toorainest kuni tarnimiseni.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" title=\"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, &quot;\u00fche peatuse&quot; teenus on taas paranenud.\" class=\"aligncenter wp-image-253 size-full\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b1.jpg\" alt=\"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, &quot;\u00fche peatuse&quot; teenus on taas paranenud.\" width=\"670\" height=\"736\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b1.jpg 670w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b1-273x300.jpg 273w\" sizes=\"auto, (max-width: 670px) 100vw, 670px\" \/><\/figure>\r\n\r\n\r\n\r\n<p>Kahepartiiliste projektide puhul kasutati segmenditud eelt\u00f6\u00f6de meetodit. Tootmisprotsessi k\u00e4igus tuleb seadmete komponentide suurust rangelt kontrollida, et tagada seadmete edukas kokkupanek p\u00e4rast Brasiiliasse saabumist.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" title=\"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, &quot;\u00fche peatuse&quot; teenus on taas paranenud.\" class=\"aligncenter wp-image-254 size-full\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b2.jpg\" alt=\"Daming Manufacturing | Paljud konteinerid on \u00fcksteise j\u00e4rel eksporditud, &quot;\u00fche peatuse&quot; teenus on taas paranenud.\" width=\"664\" height=\"707\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b2.jpg 664w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2023\/07\/\u5854\u5668\u6848\u4f8b2-282x300.jpg 282w\" sizes=\"auto, (max-width: 664px) 100vw, 664px\" \/><\/figure>\r\n\r\n\r\n\r\n<p>Klientidega \u00f5igeaegse suhtlemise kaudu kasutasime t\u00e4ielikult oma eeliseid, kontrollisime rangelt iga protsessi ning t\u00e4itsime kvaliteedi-, pakendamis- ja transpordin\u00f5udeid.<\/p>\r\n\r\n\r\n\r\n<p>Mitme laevaprojekti edukas eksport ei t\u00f5estanud mitte ainult, et Da Ming on t\u00e4ielikult v\u00f5imeline eksportima igasuguseid laevu rahvusvahelistele tippklientidele, vaid t\u00e4histas ka Da Mingi tootmis- ja kokkupanekuv\u00f5ime paranemist ning \"\u00fche peatuse\" tugevust.<\/p>\r\n\r\n\r\n\r\n<p>Praegu Da Ming teenus on kaetud energia, tselluloosi, naftakeemia ja teiste t\u00f6\u00f6stusharude, alates materjali, montaa\u017e kohapeal v\u00f5i l\u00f5petades \u00fcldise tootmise seadmed, on v\u00f5itnud palju kiitust ja pidevat koost\u00f6\u00f6d.<\/p>\r\n\r\n\r\n\r\n<p>Tulevikus Da Ming j\u00e4tkab s\u00fcvendada klientide vajadusi, anda t\u00e4ielik m\u00e4ng oma eeliseid, kogu s\u00fcdamest teha head t\u00f6\u00f6d \"\u00fche peatuse\" teenust kogu t\u00f6\u00f6stusahela jaoks, samal ajal tugevdada tehnoloogilist innovatsiooni, aidata klientidel parandada oma \u00fcldist konkurentsiv\u00f5imet, k\u00e4sik\u00e4es saavutada win-win arengut!<\/p>","protected":false},"excerpt":{"rendered":"<p>Since the successful delivery of the first batch of duplex-steel tower for famous first-rate paper mills\u00a0at the end of Sept., Da Ming Heavy Industry has\u00a0delivered GNA II condenser\u00a0for\u00a0Siemens Energy, pulping\u00a0equipment,\u00a0duplex-steel reactor prefabrication projects recently ,\u00a0which\u00a0highlighted\u00a0Daming&#8217;s &#8220;one-stop&#8221; processing and manufacturing services for\u00a0vessels. GNA II condenser equipment for Siemens Energy\u00a0 Siemens Energy is a technology enterprise with [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":251,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-287","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daming-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/posts\/287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/comments?post=287"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/posts\/287\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/media\/251"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/media?parent=287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/categories?post=287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/tags?post=287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}