{"id":1663,"date":"2025-05-13T17:40:59","date_gmt":"2025-05-13T09:40:59","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=1663"},"modified":"2025-05-13T17:40:59","modified_gmt":"2025-05-13T09:40:59","slug":"another-lng-project-daming-participated-finishes-dome-lifting-in-yanan","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/et\/another-lng-project-daming-participated-finishes-dome-lifting-in-yanan\/","title":{"rendered":"Teine LNG projekt Daming osales l\u00f5petab kuppel t\u00f5stmise Yan'anis"},"content":{"rendered":"<p style=\"text-align: justify;\">Shaanxi Yanchang Petroleumi Yan\u2019an LNG-projekt, mille \u00fcldlepingu s\u00f5lmis Beijing Petrochemical Engineering, on teinud olulisi edusamme.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1665\" aria-describedby=\"caption-attachment-1665\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1665\" title=\"LNG-tankide kuppelit\u00f5stmine l\u00f5ppes Yan\u2019anis\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1024x576.jpg\" alt=\"LNG-tankide kuppel\u00f5mblused l\u00f5petatakse Yan&#039;anis\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1024x576.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-300x169.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-768x432.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-1536x864.jpg 1536w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-2048x1152.jpg 2048w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/LNG-Tank-Dome-Lifting-Finishes-in-Yanan-18x10.jpg 18w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1665\" class=\"wp-caption-text\">LNG-tankide kuppelit\u00f5stmine l\u00f5ppes Yan\u2019anis<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Kaks 50 000 m\u00b3 LNG-s\u00e4ilitustanki on edukalt l\u00e4binud olulise protsessi \u2013 topelttankide s\u00fcnkroonse kuppelit\u00f5stmise \u2013 ja see t\u00e4histab projekti peamise konstruktsiooni ehituse l\u00f5ppu ning ametlikku \u00fcleminekut sisemiste tankide paigaldamise etappi, mis loob kindla aluse projekti j\u00e4rgmiseks k\u00e4ivitamiseks ja ekspluatatsiooniks.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Jingjiang Daming on kasutanud oma tugevusi ja tarninud 7000 tonni 9% nikkelterast LNG-s\u00e4ilitustankide jaoks, sealhulgas nii sisemise kui ka v\u00e4liskoore seinapaneelid ja p\u00f5hjaplaadid, n\u00e4itamaks taas Damingi teenindusv\u00f5imekust selles valdkonnas.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Daming ja partnerid, Beijing Petrochemical Engineering ning CITIC Pacific Special Steel, olid samuti kutsutud osalema tseremoonial, et tunnistada seda koost\u00f6\u00f6saavutuse suurt hetke.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1664\" aria-describedby=\"caption-attachment-1664\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1664\" title=\"Daming tarnis 7000 tonni 9 nikkelterast\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-1024x576.png\" alt=\"Daming tarnis 7000 tonni 9 nikkelterast\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-1024x576.png 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-300x169.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-768x432.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel-18x10.png 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/provided-7000-tons-of-9-Nickel-steel.png 1080w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1664\" class=\"wp-caption-text\">Daming tarnis 7000 tonni 9 nikkelterast<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">LNG-tankide ehitusprotsessi k\u00f5ige keerukama osana on pneumaatiline t\u00f5stmine v\u00e4ga raske ja riskantne. Nr 1 ja Nr 2 tankides, kus rakendati kupli t\u00f5stmist, kasutati arenenud bimetallilist t\u00e4ie mahuga konstruktsiooni; v\u00e4limise tanki sisemine diameeter ulatus 52 meetrini ja v\u00f5lvi avang 51,8 meetrini. 2 tundi ja 18 minutit kestnud t\u00e4psusoperatsioonis t\u00f5steti iga tanki 457,37-tonnise kuppeli edukalt ja sujuvalt 29,57 meetri k\u00f5rgusele ning viidi l\u00f5puks \u00e4ra t\u00e4pne dokkimine r\u00f5ngaga, luues kindla aluse nr 3 ja nr 4 tankide j\u00e4rgmiseks kupli t\u00f5stmiseks.<\/p>\n<p style=\"text-align: justify;\">\n<figure id=\"attachment_1666\" aria-describedby=\"caption-attachment-1666\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1666\" title=\"Daming osales Yanan LNG-projekti kupli t\u00f5stmise tseremoonial\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1024x768.jpg\" alt=\"Daming osales Yanan LNG-projekti kupli t\u00f5stmise tseremoonial\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1024x768.jpg 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-300x225.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-768x576.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-1536x1152.jpg 1536w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-2048x1536.jpg 2048w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/05\/Daming-Attended-the-Dome-Lifting-Ceremony-of-Yanan-LNG-Project-16x12.jpg 16w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1666\" class=\"wp-caption-text\">Daming osales Yanan LNG-projekti kupli t\u00f5stmise tseremoonial<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Yan\u2019anis asuva elut\u00e4htsa projektina on projekti kavandatud tootma 400 000 tonni LNG-d aastas. Projekti l\u00f5puleviimisel lahendatakse efektiivselt Yan\u2019anis ja selle \u00fcmbruskonnas elavate inimeste gaasivajadus, v\u00e4hendatakse j\u00e4tkuvalt s\u00fcsinikuemissioone ning see on v\u00e4ga oluline piirkondliku energiastruktuuri optimeerimisel, inimeste eluaseme gaasitarbimise ohutuse tagamisel ja vanade revolutsiooniliste piirkondade rohelise arengu edendamisel.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Seni on Daming teenindanud enam kui 70 LNG-tankide ja enam kui 100 000 tonni materjali prefabricatsiooni ja t\u00f6\u00f6tlemist, h\u00f5lmates enam kui 40% LNG vastuv\u00f5tumaju Guangxist Tianjini Caofeidianini, mis on saanud LNG-projektide objektide \u00fcheh\u00e4\u00e4lse tunnustuse ning arendab tulevikus j\u00e4rk-j\u00e4rgult LNG-projekte v\u00e4lismaal ja maapealseid LNG vastuv\u00f5tumaju projekte.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Shaanxi Yanchang Petroleum\u2019s Yan&#8217;an LNG Project, which was generally contracted by Beijing Petrochemical Engineering, has made significant progress. Two 50,000 m\u00b3 LNG storage tanks have successfully completed the key process of double tank synchronous dome lifting, marking the completion of the main structure construction of the project and the formal entry into the internal [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1665,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[468],"tags":[580,457,578,579,476],"class_list":["post-1663","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-damings-products","tag-beijing-petrochemical-engineering","tag-daming-international","tag-jingjiang-daming","tag-lng-receiving-terminal","tag-lng-tank"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/posts\/1663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/comments?post=1663"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/posts\/1663\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/media\/1665"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/media?parent=1663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/categories?post=1663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/et\/wp-json\/wp\/v2\/tags?post=1663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}