{"id":2385,"date":"2026-01-03T17:08:46","date_gmt":"2026-01-03T09:08:46","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=2385"},"modified":"2026-01-03T17:08:46","modified_gmt":"2026-01-03T09:08:46","slug":"daming-delivers-custom-mining-equipment-ahead-of-schedule-for-cmoc-group-limited","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/cs\/daming-delivers-custom-mining-equipment-ahead-of-schedule-for-cmoc-group-limited\/","title":{"rendered":"Daming Delivers Custom Mining Equipment Ahead of Schedule for CMOC Group Limited"},"content":{"rendered":"<p style=\"text-align: justify;\" data-start=\"319\" data-end=\"682\">Daming Heavy Industry, in collaboration with Jingjiang Daming, has successfully completed the <strong data-start=\"413\" data-end=\"431\">early delivery<\/strong> of a batch of custom-engineered mining equipment for <strong data-start=\"491\" data-end=\"513\">CMOC Group Limited<\/strong>, one of the world\u2019s leading mining companies. The project was delivered ahead of schedule despite a compressed production timeline and demanding technical requirements.<\/p>\n<p data-start=\"319\" data-end=\"682\">\n<p style=\"text-align: justify;\" data-start=\"684\" data-end=\"914\">The achievement highlights Daming\u2019s <strong data-start=\"720\" data-end=\"753\">integrated service capability<\/strong>, combining material sourcing, precision manufacturing, and coordinated logistics to meet complex project demands while maintaining consistent quality standards.<\/p>\n<p data-start=\"684\" data-end=\"914\">\n<figure id=\"attachment_2386\" aria-describedby=\"caption-attachment-2386\" style=\"width: 793px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-2386\" title=\"Daming Heavy Industry Delivers Mining Equipment for CMOC\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/01\/Daming-Heavy-Industry-Delivers-Mining-Equipment-for-CMOC.jpg\" alt=\"Daming Heavy Industry Delivers Mining Equipment for CMOC\" width=\"793\" height=\"446\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/01\/Daming-Heavy-Industry-Delivers-Mining-Equipment-for-CMOC.jpg 793w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/01\/Daming-Heavy-Industry-Delivers-Mining-Equipment-for-CMOC-300x169.jpg 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/01\/Daming-Heavy-Industry-Delivers-Mining-Equipment-for-CMOC-768x432.jpg 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2026\/01\/Daming-Heavy-Industry-Delivers-Mining-Equipment-for-CMOC-18x10.jpg 18w\" sizes=\"(max-width: 793px) 100vw, 793px\" \/><figcaption id=\"caption-attachment-2386\" class=\"wp-caption-text\">Daming Heavy Industry Delivers Mining Equipment for CMOC<\/figcaption><\/figure>\n<p data-start=\"684\" data-end=\"914\">\n<h3 style=\"text-align: justify;\" data-start=\"916\" data-end=\"976\">High-Performance Materials for Harsh Mining Environments<\/h3>\n<p style=\"text-align: justify;\" data-start=\"978\" data-end=\"1347\">The equipment was manufactured using a range of specialized materials, including <strong data-start=\"1059\" data-end=\"1085\">duplex stainless steel<\/strong>, selected for its superior corrosion resistance and mechanical strength under elevated temperatures. These properties are essential for mining operations exposed to high wear and aggressive conditions, ensuring long-term performance and operational reliability.<\/p>\n<p data-start=\"978\" data-end=\"1347\">\n<h3 style=\"text-align: justify;\" data-start=\"1349\" data-end=\"1407\">Accelerated Execution Through Cross-Team Collaboration<\/h3>\n<p style=\"text-align: justify;\" data-start=\"1409\" data-end=\"1694\">Following an urgent request from the client to advance the delivery date, Daming launched an accelerated execution plan. A joint task force spanning Daming Heavy Industry and Jingjiang Daming coordinated engineering, production, and supply chain activities to ensure timely completion.<\/p>\n<p data-start=\"1409\" data-end=\"1694\">\n<p style=\"text-align: justify;\" data-start=\"1696\" data-end=\"1718\">Key measures included:<\/p>\n<ul style=\"text-align: justify;\" data-start=\"1720\" data-end=\"2443\">\n<li data-start=\"1720\" data-end=\"1914\">\n<p data-start=\"1722\" data-end=\"1914\"><strong data-start=\"1722\" data-end=\"1758\">Material availability assurance:<\/strong> Leveraging the Group\u2019s global sourcing network, critical materials such as duplex stainless steel were secured and delivered within shortened lead times.<\/p>\n<\/li>\n<li data-start=\"1915\" data-end=\"2211\">\n<p data-start=\"1917\" data-end=\"2211\"><strong data-start=\"1917\" data-end=\"1953\">Optimized production sequencing:<\/strong> Parallel manufacturing replaced conventional linear workflows, with multiple processes\u2014including bevel preparation, grinding, non-destructive testing, and surface finishing\u2014executed concurrently to reduce cycle time without compromising quality or safety.<\/p>\n<\/li>\n<li data-start=\"2212\" data-end=\"2443\">\n<p data-start=\"2214\" data-end=\"2443\"><strong data-start=\"2214\" data-end=\"2251\">Real-time technical coordination:<\/strong> Continuous communication with the client and design teams enabled rapid clarification and adjustment of technical drawings, ensuring full compliance with specifications throughout production.<\/p>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\" data-start=\"2445\" data-end=\"2484\">Supporting Global Mining Operations<\/h3>\n<p style=\"text-align: justify;\" data-start=\"2486\" data-end=\"2828\">This project further demonstrates Daming\u2019s ability to support <strong data-start=\"2548\" data-end=\"2581\">international mining projects<\/strong> with customized, high-specification equipment and dependable delivery performance. In recent years, Daming Heavy Industry has expanded its global footprint, offering end-to-end services spanning material supply, fabrication, and export logistics.<\/p>\n<p data-start=\"2486\" data-end=\"2828\">\n<p style=\"text-align: justify;\" data-start=\"2830\" data-end=\"3170\">Daming\u2019s products are currently in operation across major mining regions in <strong data-start=\"2906\" data-end=\"2961\">North America, South America, Australia, and Africa<\/strong>, serving a broad range of global resource companies. The company\u2019s focus on process control, material traceability, and delivery reliability has helped build long-term partnerships with international clients.<\/p>\n<p data-start=\"2830\" data-end=\"3170\">\n<h3 style=\"text-align: justify;\" data-start=\"3172\" data-end=\"3189\">Moving Forward<\/h3>\n<p style=\"text-align: justify;\" data-start=\"3191\" data-end=\"3538\">Daming will continue to invest in manufacturing capabilities, supply chain integration, and project execution efficiency to support customers in the global mining and heavy equipment sectors. Through consistent quality and reliable delivery, the company aims to further strengthen its position as a trusted supplier of engineered mining solutions.<\/p>","protected":false},"excerpt":{"rendered":"<p>Daming Heavy Industry, in collaboration with Jingjiang Daming, has successfully completed the early delivery of a batch of custom-engineered mining equipment for CMOC Group Limited, one of the world\u2019s leading mining companies. The project was delivered ahead of schedule despite a compressed production timeline and demanding technical requirements. The achievement highlights Daming\u2019s integrated service capability, [&hellip;]<\/p>","protected":false},"author":4,"featured_media":2387,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[636],"tags":[826,457,505],"class_list":["post-2385","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daming-heavy-industry","tag-cmoc-group-limited","tag-daming-international","tag-mining-equipment"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts\/2385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/comments?post=2385"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts\/2385\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/media\/2387"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/media?parent=2385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/categories?post=2385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/tags?post=2385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}