{"id":1759,"date":"2025-07-08T17:47:55","date_gmt":"2025-07-08T09:47:55","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=1759"},"modified":"2025-07-08T17:55:44","modified_gmt":"2025-07-08T09:55:44","slug":"latest-case-study-hong-kong-s960-footbridge-project","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/cs\/latest-case-study-hong-kong-s960-footbridge-project\/","title":{"rendered":"Latest Case Study: Hong Kong S960 Footbridge Project"},"content":{"rendered":"<p style=\"text-align: justify;\">Prvn\u00ed sv\u011btov\u00e1 slavnostn\u00ed zved\u00e1n\u00ed \u010dty\u0159pr\u016fjezdov\u00e9 l\u00e1vky ze slitiny S960 s ultravysokou pevnost\u00ed se \u00fasp\u011b\u0161n\u011b uskute\u010dnila v Hongkongu 4. \u010dervence za p\u0159\u00edtomnosti z\u00e1stupc\u016f vl\u00e1dy, ocel\u00e1ren, univerzit, Damingu a m\u00e9di\u00ed, kte\u0159\u00ed spole\u010dn\u011b p\u0159ihl\u00ed\u017eeli tomuto v\u00fdznamn\u00e9mu ud\u00e1losti.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Projekt l\u00e1vky je veden\u00fd \u00da\u0159adem pro stavebnictv\u00ed a rozvoj Hongkongu a nach\u00e1z\u00ed se v po\u010d\u00e1te\u010dn\u00ed f\u00e1zi nov\u00e9ho oblasti Fanling North \u2013 konkr\u00e9tn\u011b ve v\u00fdchodn\u00edm segmentu obchvatu Fanling.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_1761\" aria-describedby=\"caption-attachment-1761\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1761\" title=\"Pr\u016fjezd l\u00e1vky byl zvednut\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-1024x576.png\" alt=\"Pr\u016fjezd l\u00e1vky byl zvednut\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-1024x576.png 1024w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-300x169.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-768x432.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted-18x10.png 18w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/The-Footbridge-Span-is-Lifted.png 1080w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-1761\" class=\"wp-caption-text\">Pr\u016fjezd l\u00e1vky byl zvednut<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Jedn\u00e1 se o prvn\u00ed sv\u011btov\u00fd p\u0159\u00edpad pou\u017eit\u00ed slitiny S960 s vysokou pevnost\u00ed ve stavebnictv\u00ed ob\u010dansk\u00fdch most\u016f.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">\u00dasp\u011b\u0161n\u00e9 proveden\u00ed tohoto projektu poslou\u017eilo jako vzor pro budouc\u00ed mostn\u00ed stavby v r\u00e1mci stavebn\u00edho sektoru.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Pou\u017eit\u00ed slitiny S960 s vysokou pevnost\u00ed m\u016f\u017ee v\u00fdrazn\u011b sn\u00ed\u017eit hmotnost mostn\u00ed konstrukce i po\u010det z\u00e1kladov\u00fdch pilot, co\u017e vedlo ke \u0161et\u0159en\u00ed p\u016fdy, sn\u00ed\u017een\u00ed uhl\u00edkov\u00fdch emis\u00ed a zv\u00fd\u0161en\u00ed udr\u017eitelnosti projektu.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Nav\u00edc lze komponenty ze slitiny S960 s vysokou pevnost\u00ed p\u0159edv\u00fdrobit v tov\u00e1rn\u011b, co\u017e v\u00fdrazn\u011b sni\u017euje po\u010det proces\u016f prov\u00e1d\u011bn\u00fdch na m\u00edst\u011b. Tato mont\u00e1\u017e na m\u00edst\u011b sni\u017euje uhl\u00edkov\u00e9 emise o 35% a zkracuje dobu v\u00fdstavby o 40% ve srovn\u00e1n\u00ed s tradi\u010dn\u00edmi postupy, \u010d\u00edm\u017e dosahuje pokrok\u016f ve rychlosti, kvalit\u011b, efektivit\u011b a kvantit\u011b projektu.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Projekt je vysoce v\u00fdznamn\u00fd a slo\u017eit\u00fd; b\u011bhem jeho realizace dostal rozs\u00e1hlou podporu od vl\u00e1dn\u00edch org\u00e1n\u016f, pr\u016fmyslov\u00fdch l\u00eddr\u016f i akademick\u00fdch kruh\u016f. Technick\u00e9 experiment\u00e1ln\u00ed v\u00fdsledky poskytnut\u00e9 odborn\u00edky na ocelov\u00e9 konstrukce z Hongkongsk\u00e9 polytechnick\u00e9 univerzity a Tsinghua University byly kl\u00ed\u010dov\u00e9; AECOM, p\u0159edn\u00ed sv\u011btov\u00e1 firma, zaji\u0161\u0165ovala n\u00e1vrh a dozor nad stavbou, zat\u00edmco sv\u00e1\u0159e\u010d\u0161t\u00ed a nat\u011bra\u010d\u0161t\u00ed in\u017een\u00fd\u0159i SGS p\u0159isp\u00edvaj\u00ed k celkov\u00e9mu \u00fasil\u00ed koordinovan\u00e9mu Daming Heavy Industry pro dod\u00e1vku zak\u00e1zek.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_1762\" aria-describedby=\"caption-attachment-1762\" style=\"width: 883px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1762\" title=\"Daming vyrobil celkovou konstrukci ze slitiny S960 s vysokou pevnost\u00ed\" src=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure.png\" alt=\"Daming vyrobil celkovou konstrukci ze slitiny S960 s vysokou pevnost\u00ed\" width=\"883\" height=\"553\" srcset=\"https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure.png 883w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure-300x188.png 300w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure-768x481.png 768w, https:\/\/www.dmsteels.com\/wp-content\/uploads\/2025\/07\/Daming-Fabricates-the-Overall-S960-High-strenght-Steel-Structure-18x12.png 18w\" sizes=\"auto, (max-width: 883px) 100vw, 883px\" \/><figcaption id=\"caption-attachment-1762\" class=\"wp-caption-text\">Daming vyrobil celkovou konstrukci ze slitiny S960 s vysokou pevnost\u00ed<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Jedn\u00e1 se o prvn\u00ed p\u0159\u00edpad, kdy se Daming Heavy Industry zapojila do projektu l\u00e1vky. B\u011bhem realizace nejen zajistila kvalitn\u00ed dod\u00e1vku materi\u00e1l\u016f, ale tak\u00e9 nab\u00eddla precizn\u00ed slu\u017eby v \u0159ez\u00e1n\u00ed, tv\u00e1\u0159en\u00ed, sv\u00e1\u0159en\u00ed a povrchov\u00e9 \u00faprav\u011b. Po celou dobu \u0159e\u0161ila technick\u00e9 probl\u00e9my, jako je tendence vysokopevnostn\u00ed oceli k deformaci a slo\u017eitosti sv\u00e1\u0159ec\u00edho procesu, a t\u00edm udr\u017eela pr\u016fb\u011bh a kvalitu projektu.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\"><strong><b>Technick\u00e1 hodnota<\/b><\/strong><\/h3>\n<p style=\"text-align: justify;\">Prost\u0159ednictv\u00edm precizn\u00ed spolupr\u00e1ce s design\u00e9ry a dozorci ze presti\u017en\u00edch sv\u011btov\u00fdch firem Daming zlep\u0161il sv\u00e9 technick\u00e9 standardy; d\u00edky spolupr\u00e1ci s ocel\u00e1rnami z\u00edskal v\u00fdznamn\u00e9 zku\u0161enosti ve sv\u00e1\u0159en\u00ed vysokopevnostn\u00ed oceli.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\">Mana\u017eersk\u00e1 hodnota<\/h3>\n<p style=\"text-align: justify;\">Implementac\u00ed p\u0159\u00edsn\u00fdch standard\u016f a podporou mana\u017eersk\u00fdch inovac\u00ed b\u011bhem realizace projekt\u016f, stejn\u011b jako facilitac\u00ed spolupr\u00e1ce mezi t\u00fdmy z pr\u016fmyslu, akademie, v\u00fdzkumu a aplikace, byly z\u00edsk\u00e1ny cenn\u00e9 zku\u0161enosti v oblasti mezin\u00e1rodn\u00edho projektov\u00e9ho \u0159\u00edzen\u00ed.<\/p>\n<h3 style=\"text-align: justify;\">Zna\u010dkov\u00e1 hodnota<\/h3>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">\u00da\u010dinnost \u201cjednoho stop\u201d slu\u017eeb Damingu byla op\u011bt potvrzena, co\u017e roz\u0161\u00ed\u0159ilo spektrum nab\u00edzen\u00fdch slu\u017eeb a zv\u00fd\u0161ilo vliv zna\u010dky Daming.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\">Pr\u016fmyslov\u00e1 hodnota<\/h3>\n<p style=\"text-align: justify;\">Podpo\u0159il dom\u00e1c\u00ed v\u00fdrobu high-end materi\u00e1l\u016f a rozvoj pr\u016fmyslu, co\u017e je nejd\u016fle\u017eit\u011bj\u0161\u00ed faktor pro rozvoj pr\u016fmyslu. Pr\u016fmyslov\u00e1 hodnota: Podpora lokality a aplikace high-end materi\u00e1l\u016f.<\/p>\n<p>&nbsp;<\/p>\n<h3 style=\"text-align: justify;\">Soci\u00e1ln\u00ed hodnota<\/h3>\n<p style=\"text-align: justify;\">Jedn\u00e1 se o silnou spolupr\u00e1ci mezi Damingem a vl\u00e1dou HKSAR, kter\u00e1 umo\u017e\u0148uje vl\u00e1d\u011b pozorovat vynikaj\u00edc\u00ed v\u00fdrobn\u00ed slu\u017eby pevninsk\u00e9 \u010c\u00edny a z\u00e1rove\u0148 posiluje jednotu a spolupr\u00e1ci mezi ob\u011bma regiony.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Realizace projektu l\u00e1vky ze slitiny S960 s ultravysokou pevnost\u00ed v Hongkongu je v\u00fdznamn\u00fdm miln\u00edkem, kter\u00fd ozna\u010duje 76. v\u00fdro\u010d\u00ed zalo\u017een\u00ed \u010c\u00edny a 28. v\u00fdro\u010d\u00ed zalo\u017een\u00ed Speci\u00e1ln\u00ed spr\u00e1vn\u00ed oblasti Hongkong.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Na z\u00e1klad\u011b t\u00e9to \u00fasp\u011b\u0161n\u00e9 spolupr\u00e1ce se Daming bude sna\u017eit prohlubovat spolupr\u00e1ci mezi pr\u016fmyslem, akademi\u00ed a v\u00fdzkumem a bude neust\u00e1le zlep\u0161ovat sv\u00e9 inova\u010dn\u00ed kapacity, aby efektivn\u011bji p\u0159isp\u00edval k v\u011bt\u0161\u00edm infrastrukturn\u00edm projekt\u016fm.<\/p>","protected":false},"excerpt":{"rendered":"<p>The world&#8217;s first S960 Ultra High Strength Steel Footbridge Quadruple Span Lifting\u00a0Ceremony was successfully conducted in Hong Kong on July 4, with representatives from the government, steel mills, universities, Daming, and the media present to collectively witness this significant event. &nbsp; The bridge project is led by the Hong Kong Civil Engineering and Development Department [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1765,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[468],"tags":[457,658,659],"class_list":["post-1759","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-damings-products","tag-daming-international","tag-hong-kong-s960-footbridge-project","tag-s960-ultra-high-strength-steel-footbridge"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts\/1759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/comments?post=1759"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts\/1759\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/media\/1765"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/media?parent=1759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/categories?post=1759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/tags?post=1759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}