{"id":1546,"date":"2025-01-16T17:43:29","date_gmt":"2025-01-16T09:43:29","guid":{"rendered":"https:\/\/www.dmsteels.com\/?p=1546"},"modified":"2025-01-17T17:23:18","modified_gmt":"2025-01-17T09:23:18","slug":"daming-participates-in-the-construction-of-cnoocs-first-270000-cubic-meter-lng-storage-base","status":"publish","type":"post","link":"https:\/\/www.dmsteels.com\/cs\/daming-participates-in-the-construction-of-cnoocs-first-270000-cubic-meter-lng-storage-base\/","title":{"rendered":"Spole\u010dnost Daming se pod\u00edl\u00ed na v\u00fdstavb\u011b prvn\u00edho z\u00e1sobn\u00edku LNG spole\u010dnosti CNOOC o objemu 270 000 metr\u016f krychlov\u00fdch"},"content":{"rendered":"<p>Dne 6. ledna byla dokon\u010dena p\u0159edchlazovac\u00ed f\u00e1ze a \u00fasp\u011b\u0161n\u011b napln\u011bna kapalinou skladovac\u00ed n\u00e1dr\u017e \u010d. 10 nejv\u011bt\u0161\u00ed z\u00e1sobn\u00ed z\u00e1kladny LNG (zkapaln\u011bn\u00e9ho zemn\u00edho plynu) v \u010c\u00edn\u011b, CNOOC Yancheng \"Green Energy Port\", co\u017e znamen\u00e1 \u00fasp\u011b\u0161n\u00e9 uveden\u00ed do provozu prvn\u00ed nez\u00e1visle vyvinut\u00e9, navr\u017een\u00e9 a postaven\u00e9 skladovac\u00ed n\u00e1dr\u017ee CNOOC o objemu 270 000 metr\u016f krychlov\u00fdch LNG s nejv\u011bt\u0161\u00ed kapacitou jedn\u00e9 n\u00e1dr\u017ee na sv\u011bt\u011b.<\/p>\n<p>&nbsp;<\/p>\n<p>Tato operace ov\u011b\u0159ila bezpe\u010dnost a spolehlivost kl\u00ed\u010dov\u00fdch technick\u00fdch ukazatel\u016f skladovac\u00ed n\u00e1dr\u017ee a poskytla dobrou referenci pro technick\u00e9 pou\u017eit\u00ed 270 000 metr\u016f krychlov\u00fdch skladovac\u00edch n\u00e1dr\u017e\u00ed na LNG v \u010c\u00edn\u011b, co\u017e nazna\u010duje, \u017ee technologie n\u00e1vrhu a konstrukce ultra velkoobjemov\u00fdch skladovac\u00edch n\u00e1dr\u017e\u00ed na LNG v na\u0161\u00ed zemi dos\u00e1hla p\u0159edn\u00ed sv\u011btov\u00e9 \u00farovn\u011b. Z\u00e1sobn\u00edk LNG o objemu 270 000 metr\u016f krychlov\u00fdch vyu\u017e\u00edv\u00e1 z\u00e1kladn\u00ed technologii z\u00e1sobn\u00edku CGTank\u00ae s nez\u00e1visl\u00fdmi pr\u00e1vy du\u0161evn\u00edho vlastnictv\u00ed spole\u010dnosti CNOOC. N\u00e1dr\u017e m\u00e1 pr\u016fm\u011br p\u0159es 100 metr\u016f a v\u00fd\u0161ku p\u0159ibli\u017en\u011b 65 metr\u016f. Lze do n\u00ed naskl\u00e1dat t\u0159i velk\u00e1 letadla C919 najednou. Objem odpov\u00edd\u00e1 614 standardn\u00edm plaveck\u00fdm baz\u00e9n\u016fm. Lze v n\u00ed uskladnit 119 000 tun LNG, co\u017e m\u016f\u017ee zajistit dva m\u011bs\u00edce \u017eivota na plynu pro 22 milion\u016f obyvatel, co\u017e odpov\u00edd\u00e1 sn\u00ed\u017een\u00ed emis\u00ed oxidu uhli\u010dit\u00e9ho o 200 000 tun. Poskytne nov\u00fd impuls a nov\u00e9 v\u00fdhody pro n\u00e1rodn\u00ed energetickou bezpe\u010dnost a region\u00e1ln\u00ed z\u00e1sobov\u00e1n\u00ed energi\u00ed.<\/p>\n<p>&nbsp;<\/p>\n<p>Na z\u00e1sobn\u00edk LNG o objemu 270 000 m3 jsou kladeny mimo\u0159\u00e1dn\u011b vysok\u00e9 bezpe\u010dnostn\u00ed po\u017eadavky a proces n\u00e1vrhu a v\u00fdstavby je velmi slo\u017eit\u00fd. Jedn\u00e1 se o jednu z nejmodern\u011bj\u0161\u00edch technologi\u00ed v oblasti energetiky. na\u0161e zem\u011b je jednou z m\u00e1la zem\u00ed na sv\u011bt\u011b, kter\u00e1 m\u016f\u017ee prov\u00e1d\u011bt projektov\u00e1n\u00ed a v\u00fdstavbu ultra velk\u00fdch z\u00e1sobn\u00edk\u016f LNG.<\/p>\n<p>&nbsp;<\/p>\n<p>Ka\u017ed\u00fd krok je pln\u00fd v\u00fdzev, od v\u00fdstavby pilotov\u00fdch z\u00e1klad\u016f, vylit\u00ed vn\u011bj\u0161\u00ed n\u00e1dr\u017ee, zvednut\u00ed tlaku vzduchu, instalace vnit\u0159n\u00ed n\u00e1dr\u017ee a studen\u00e9 izolace, zkou\u0161ky tlaku vody a tlaku vzduchu, v\u00fdm\u011bny dus\u00edku a\u017e po kone\u010dn\u00e9 mechanick\u00e9 dokon\u010den\u00ed a spu\u0161t\u011bn\u00ed p\u0159edchlazen\u00ed.<\/p>\n<p>&nbsp;<\/p>\n<p>V sou\u010dasn\u00e9 dob\u011b dos\u00e1hl pod\u00edl na trhu supervelk\u00fdch z\u00e1sobn\u00edk\u016f LNG o objemu 270 000 metr\u016f krychlov\u00fdch postaven\u00fdch pomoc\u00ed nez\u00e1visl\u00e9 technologie CNOOC CGTank\u00ae 71%, co\u017e je prvn\u00ed m\u00edsto na sv\u011bt\u011b. Uveden\u00ed prvn\u00edho z\u00e1sobn\u00edku LNG o objemu 270 000 metr\u016f krychlov\u00fdch do provozu d\u00e1le upev\u0148uje vedouc\u00ed postaven\u00ed spole\u010dnosti CNOOC v odv\u011btv\u00ed LNG.<\/p>\n<p>&nbsp;<\/p>\n<p>Krom\u011b toho v kritick\u00e9m obdob\u00ed dod\u00e1vek zemn\u00edho plynu v zim\u011b nov\u011b zprovozn\u011bn\u00e9 z\u00e1sobn\u00edky LNG o objemu 270 000 metr\u016f krychlov\u00fdch tak\u00e9 \u00fa\u010dinn\u011b zv\u00fd\u0161\u00ed celkov\u00e9 z\u00e1soby LNG v p\u0159\u00edstavu CNOOC Yancheng \"Green Energy Port\" a dodaj\u00ed \"jistotu\" pro nouzovou regulaci \u0161pi\u010dek.<\/p>\n<p>&nbsp;<\/p>\n<p>V sou\u010dasn\u00e9 dob\u011b jsou procesn\u00ed za\u0159\u00edzen\u00ed a vybaven\u00ed p\u0159\u00edstavu CNOOC Yancheng \"Green Energy Port\" odlad\u011bny a uvedeny do \u00fa\u010dinn\u00e9ho a bezpe\u010dn\u00e9ho pohotovostn\u00edho stavu. Vynakl\u00e1daj\u00ed ve\u0161ker\u00e9 \u00fasil\u00ed v oblasti z\u00e1sob LNG, p\u0159epravy cisternami a dod\u00e1vek plynu potrub\u00edm.<\/p>\n<p>a vytv\u00e1\u0159ej\u00ed dobr\u00fd \"kombinovan\u00fd \u00fader\", aby zajistily dod\u00e1vky plynu v obdob\u00ed nejvy\u0161\u0161\u00ed spot\u0159eby plynu v zim\u011b, odhodlan\u011b br\u00e1n\u00ed teplou \"obrannou linii\" a p\u0159isp\u00edvaj\u00ed k optimalizaci a modernizaci dod\u00e1vek zemn\u00edho plynu a energetick\u00e9 struktury ve v\u00fdchodn\u00ed \u010c\u00edn\u011b.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 14pt;\"><strong>S\u00edla prefabrikace n\u00e1dr\u017e\u00ed na LNG Daming<\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<p>V porovn\u00e1n\u00ed s tradi\u010dn\u00edmi mal\u00fdmi a st\u0159edn\u00edmi z\u00e1sobn\u00edky LNG se obt\u00ed\u017enost n\u00e1vrhu a konstrukce velk\u00fdch z\u00e1sobn\u00edk\u016f LNG exponenci\u00e1ln\u011b zv\u00fd\u0161ila, zat\u00edmco kapacita a velikost se zv\u011bt\u0161ily. Na z\u00e1klad\u011b pl\u00e1nu dod\u00e1vek projektu a skute\u010dn\u00fdch dod\u00e1vek materi\u00e1lu, op\u00edraj\u00edc\u00edho se o bohat\u00e9 zku\u0161enosti se zpracov\u00e1n\u00edm oceli 9Ni a o v\u00fdkonnostn\u00ed v\u00fdhody modern\u00edho vybaven\u00ed, jako je automatick\u00e1 fr\u00e9zka Linsinger, spole\u010dnost Daming aktivn\u011b spolupracovala se spole\u010dnost\u00ed Taigang na dokon\u010den\u00ed prefabrikace vnit\u0159n\u00edch n\u00e1dr\u017e\u00ed dvou z\u00e1sobn\u00edk\u016f LNG o objemu 220 000 m\u00b3 a \u010dty\u0159 z\u00e1sobn\u00edk\u016f LNG o objemu 270 000 m\u00b3 v prvn\u00ed f\u00e1zi s vysokou kvalitou a efektivitou, p\u0159i\u010dem\u017e celkov\u00fd objem zpracov\u00e1n\u00ed \u010dinil 13 800 tun.<\/p>\n<p>&nbsp;<\/p>\n<p>V sou\u010dasn\u00e9 dob\u011b spole\u010dnost Daming obsluhuje v\u00edce ne\u017e 70 n\u00e1dr\u017e\u00ed na LNG a v\u00edce ne\u017e 100 000 tun prefabrikace materi\u00e1lu, co\u017e pokr\u00fdv\u00e1 v\u00edce ne\u017e 40% termin\u00e1l\u016f pro p\u0159\u00edjem LNG od Guangxi po Caofeidian v Tianjinu, a z\u00edskala jednomysln\u00e9 uzn\u00e1n\u00ed a pod\u011bkov\u00e1n\u00ed od m\u00edst, kde se realizuj\u00ed projekty LNG, a v budoucnu bude postupn\u011b rozv\u00edjet z\u00e1mo\u0159sk\u00e9 projekty LNG a pozemn\u00ed termin\u00e1ly pro p\u0159\u00edjem LNG.<\/p>\n<p>&nbsp;<\/p>\n<p>Spole\u010dnost Daiming se op\u00edr\u00e1 o v\u00fdhody \"bal\u00ed\u010dkov\u00e9\" slu\u017eby prefabrikace n\u00e1dr\u017e\u00ed QCDS a je p\u0159esv\u011bd\u010dena, \u017ee m\u016f\u017ee pomoci v\u00edce z\u00e1kazn\u00edk\u016fm realizovat lehk\u00fd majetek, rychl\u00e9 dod\u00e1n\u00ed, vysokou kvalitu a dobr\u00e9 n\u00e1klady s vy\u0161\u0161\u00edmi po\u017eadavky na kvalitu a rychlej\u0161\u00ed dod\u00e1n\u00ed.<\/p>","protected":false},"excerpt":{"rendered":"<p>Dne 6. ledna byla dokon\u010dena p\u0159edchlazen\u00ed a \u00fasp\u011b\u0161n\u011b napln\u011bna kapalinou z\u00e1sobn\u00edkov\u00e1 n\u00e1dr\u017e \u010d. 10 nejv\u011bt\u0161\u00ed z\u00e1sobn\u00ed z\u00e1kladny LNG (zkapaln\u011bn\u00e9ho zemn\u00edho plynu) v \u010c\u00edn\u011b, CNOOC Yancheng \"Green Energy Port\", co\u017e znamen\u00e1 \u00fasp\u011b\u0161n\u00e9 uveden\u00ed prvn\u00ed nez\u00e1visle vyvinut\u00e9, navr\u017een\u00e9 a postaven\u00e9 z\u00e1sobn\u00edkov\u00e9 n\u00e1dr\u017ee CNOOC o objemu 270 000 metr\u016f krychlov\u00fdch LNG s nejv\u011bt\u0161\u00ed jednotlivou n\u00e1dr\u017e\u00ed [...]<\/p>","protected":false},"author":4,"featured_media":1547,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[528,457,529],"class_list":["post-1546","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daming-news","tag-cnooc","tag-daming-international","tag-yancheng-green-energy-port"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts\/1546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/comments?post=1546"}],"version-history":[{"count":0,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/posts\/1546\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/media\/1547"}],"wp:attachment":[{"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/media?parent=1546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/categories?post=1546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dmsteels.com\/cs\/wp-json\/wp\/v2\/tags?post=1546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}